Hacktoberfest 2026:维护者为十月标记出来的 issue,仍然开放、适合新手。 浏览 Hacktoberfest issue

Launch Info: wall time left for a running job (requested while queued, used once ended)

已关闭
#711 0 条评论 0 个 reaction 已指派 1 人 在 GitHub 查看

@ohlincha 已经在做这个了。

开始于 2026年10月30日。

评估

这个 Issue 还没有评估数据。

描述

Maintainer, 2026-10-30: the Launch Info block should show how much of the requested wall time is left, so a job about to run out of time is visible. The Queue state row must not overlap.

Plan: a Wall time: row in the right column after Cost, from the Launcher's wall time and the job's start date: 1 h 20 min left of 4 h while running ((nearly out) under 10 %, limit of 4 h reached past it), 4 h requested while queued, used 3 h 12 min of 4 h once ended. Both the Organizer summary and the Viewer's Calculation Summary (shared LaunchInfoRows.H). Queue state stays a full-width row below both columns, so a longer right column moves it down instead of overlapping it.

主要语言
C
星标
10
派生
8
平均合并
2 小时 39 分钟
30 天内合并 PR
9

环境准备

这个项目没有提供开发容器、Dockerfile 或贡献指南,环境需要你自己搭建:先看它的 README,通用步骤见我们的新手贡献指南。

从这里开始

  1. 先读完整个 Issue,再读项目的贡献指南。
  2. 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
  3. Fork 仓库,在一个分支上完成修改。
  4. 提交 Pull Request,并在描述里引用这个 Issue 编号。

FriendsofECCE/ECCE 的其他 Issue

查看 FriendsofECCE/ECCE 的全部 Issue

相似的 Issue

更多 C Issue

把新 issue 发到你的邮箱

精选适合新手参与的 GitHub issue 摘要。