Hacktoberfest 2026: los issues que los mantenedores marcaron para octubre, abiertos y aptos para principiantes. Explorar issues de Hacktoberfest

Launch Info: wall time left for a running job (requested while queued, used once ended)

Abierto
#711 0 comentarios 0 reacciones 1 asignado Ver en GitHub

@ohlincha ya está trabajando en esto.

Desde el 30/10/2026.

Evaluación

Este issue todavía no se ha evaluado.

Descripción

Maintainer, 2026-10-30: the Launch Info block should show how much of the requested wall time is left, so a job about to run out of time is visible. The Queue state row must not overlap.

Plan: a Wall time: row in the right column after Cost, from the Launcher's wall time and the job's start date: 1 h 20 min left of 4 h while running ((nearly out) under 10 %, limit of 4 h reached past it), 4 h requested while queued, used 3 h 12 min of 4 h once ended. Both the Organizer summary and the Viewer's Calculation Summary (shared LaunchInfoRows.H). Queue state stays a full-width row below both columns, so a longer right column moves it down instead of overlapping it.

Lenguaje dominante
C
Estrellas
10
Forks
8
Merge medio
2 h 39 min
PR fusionados (30 d)
9

Preparar el entorno

Este proyecto no incluye contenedor de desarrollo, Dockerfile ni guía de contribución, así que la configuración corre por tu cuenta: empieza por su README y consulta nuestra guía para la primera contribución para los pasos generales.

Primeros pasos

  1. Lee el issue completo y luego la guía de contribución del proyecto.
  2. Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
  3. Haz un fork del repositorio y trabaja en una rama.
  4. Abre un pull request que haga referencia al número del issue.

Más de FriendsofECCE/ECCE

Todos los issues de FriendsofECCE/ECCE

Issues similares

Más issues de C

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.