Hacktoberfest 2026:维护者为十月标记出来的 issue,仍然开放、适合新手。 浏览 Hacktoberfest issue

MD tasks: copy back traj.xtc, ener.edr and topol.tpr (or up to a size limit), and continuous time along a study chain

未关闭
#743 0 条评论 0 个 reaction 已指派 0 人 在 GitHub 查看

还没有人认领这个 Issue。

评估

难度
5/5
预计耗时
一周以上
新手友好度
30/100
Issue 类型
功能
描述清晰度
基本清楚
活跃度
活跃
技术栈
c

调研方向

Start by locating how MD tasks copy outputs into Outputs, how continuations obtain their provider's end time and step, and how the Viewer assembles a study's timelines. The issue names the run directory, Outputs, and Viewer, but no source files or tests. Done means optional, size-limited copy-back of the requested files, continuation with continuous time, and a shared time axis in the Viewer.

由索引模型根据 Issue 内容生成。

描述

After a GROMACS study finishes, traj.xtc, ener.edr and topol.tpr stay in the run directory; Outputs holds only the final .gro, chemsys.pdb and the log, so every analysis starts with ecce-fetch <task> traj.xtc ener.edr topol.tpr. And each task's clock restarts at 0 (tinit = 0), so Equilibrate and Dynamics trajectories cannot simply be joined. Wanted: copy-back of .xtc/.edr/.tpr for MD tasks (with a size limit and the option to leave them), a continuation that takes tinit and init-step from where its provider ended, and the Viewer showing a study's tasks on one time axis.

主要语言
C
星标
10
派生
8
平均合并
2 小时 39 分钟
30 天内合并 PR
9

环境准备

这个项目没有提供开发容器、Dockerfile 或贡献指南,环境需要你自己搭建:先看它的 README,通用步骤见我们的新手贡献指南。

从这里开始

  1. 先读完整个 Issue,再读项目的贡献指南。
  2. 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
  3. Fork 仓库,在一个分支上完成修改。
  4. 提交 Pull Request,并在描述里引用这个 Issue 编号。

FriendsofECCE/ECCE 的其他 Issue

查看 FriendsofECCE/ECCE 的全部 Issue

相似的 Issue

更多 C Issue

把新 issue 发到你的邮箱

精选适合新手参与的 GitHub issue 摘要。