Validator client: support Electra, Fulu and Gloas only; drop Lean and pre-Electra fork handling
Maintainer antworten meist innerhalb von 6 Tagen
Dieses Issue hat noch niemand übernommen.
Bewertung
- Schwierigkeit
- 5/5
- Geschätzter Aufwand
- Über eine Woche
- Anfängerfreundlichkeit
- 35/100
Rechercherichtung
Start with the listed fork handling in crates/validator, especially beacon_node/block_contents.rs, beacon_node/http.rs, and lib.rs, then inspect the boundary tests in attestation.rs and signing.rs. First decide whether Electra remains supported; the issue describes the tradeoff but leaves it open. Done means startup rejects unsupported schedules, client fork matches cover the chosen forks, and the boundary tests target the new supported range.
Vom Indexierungsmodell aus dem Issue-Text verfasst.
Beschreibung
The validator client (crates/validator) should support Electra, Fulu and Gloas only, and stop carrying code for ForkName::Lean and the pre-Electra forks.
Why
The client already only works from Electra on. It submits SingleAttestations to /eth/v2/beacon/pool/attestations at every fork. It also refuses pre-Electra blocks (ProducedBlock::from_ssz) and aggregates ("electra is the earliest supported"). Every network we run against (mainnet, Sepolia, Hoodi, Platåberget) is past Electra.
The code still handles the earlier forks anyway, and Lean shows up only because ForkName is shared with the lean chain in ethlambda-types. Config::fork_at_epoch never returns Lean. Each of these branches guards a state that can't occur, but a reviewer still has to reason about it. The review of #789 spent several comments on this: whether the Lean arm's error is retryable, and whether committee 0 is right before Electra.
Line numbers below are as of 9be2506c:
- Arms that exist only to fail.
Phase0 | Altair | Bellatrix | Capella | Deneb | Leanarms appear inbeacon_node/block_contents.rs:316andbeacon_node/http.rs:881. #789 addshighest_attestation_indexwith a pre-Electra arm and aLeanarm, which returns a retryableInconsistentResponseafter the request was already made. - Pre-Gloas attestation data is requested under the slot's own fork, as far back as Phase0.
a_pre_gloas_slot_is_asked_about_under_its_own_forkassertsForkName::Phase0.attestation_data_pathsendscommittee_index=0before Gloas, and every validator signs that same data. That would also be wrong before Electra, wheredata.indexmust be the attester's own committee. - The sync committee subscription gate checks
< ForkName::Altair(lib.rs:817). - Tests pinned to the Phase0/Altair boundary:
attestation.rs:769-818(theEth-Consensus-Versionheader test) and the boundary tests insigning.rs(around lines 461, 621 and 703).
Proposal
- Refuse to start before Electra. If the beacon node's schedule (from
/eth/v1/config/spec) puts the current epoch before Electra, stop at startup with one clear error. - Give the client its own fork type, e.g.
enum ValidatorFork { Electra, Fulu, Gloas }withTryFrom<ForkName>. Convert once, wherefork_at_epochis called, so everymatchin the client has three arms and noLeanor pre-Electra ones. A fork added after Gloas still breaks every match until someone decides what it means. - Remove the pre-Electra branches: the
< Altairsync gate, the pre-Electra andLeanarms in block and aggregate decoding and inhighest_attestation_index, and comments that describe pre-Electra semantics (e.g. the index as a committee). - Move the boundary tests from Phase0/Altair to the Electra/Fulu or Fulu/Gloas boundary, so they still check that headers and domains follow the right epoch.
Consider dropping Electra too
Every network the client targets is already past Fulu:
- mainnet: Fulu at epoch 411392, December 2025
- Sepolia: epoch 272640
- Hoodi: epoch 50688
- Platåberget and the kurtosis battery (
tooling/kurtosis-assertoor/network_params.yaml): Fulu from genesis
Supporting only Fulu and Gloas would remove the code that exists for Electra alone. That mainly means the per-blob-proof block contents (ProducedBlock::from_ssz's Electra arm and Contents::WithBlobProofs, which Fulu's cell proofs replaced) and whatever publishes them. It would also move the many tests that use Electra as their default fork over to Fulu. The startup check in step 1 would then refuse anything before Fulu, and the client's fork type would have two variants.
The cost is losing any network that is still on Electra, such as a local devnet configured with Electra at genesis and a later Fulu epoch. Worth deciding before step 2, since it changes the enum.
Out of scope
config_from_spec_responsekeeps parsing the whole fork schedule. Fork versions and epochs are configuration, not fork handling.- The
altair::sync committee containers stay. They are the containers in use today, not pre-Electra support.
- Vorherrschende Sprache
- Rust
- Sterne
- 86
- Forks
- 34
- Ø Merge
- 9 T. 20 Std.
- Gemergte PRs (30 T.)
- 77
Entwicklungsumgebung
- Enthält ein Dockerfile oder eine Docker-Compose-Datei
- Hat eine Pull-Request-Vorlage
- Beitragsleitfaden lesen
Erste Schritte
- Lesen Sie das ganze Issue und danach den Beitragsleitfaden des Projekts.
- Schreiben Sie ins Issue, dass Sie es übernehmen — das erspart doppelte Arbeit.
- Forken Sie das Repository und arbeiten Sie in einem Branch.
- Öffnen Sie einen Pull Request, der die Issue-Nummer nennt.
Mehr aus lambdaclass/ethlambda
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 76/100
lambdaclass/ethlambda#850 ·
Maintainer antworten meist innerhalb von 6 Tagen
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 68/100
lambdaclass/ethlambda#777 · 1 Reaktion ·
Maintainer antworten meist innerhalb von 6 Tagen
-
Run all gossip validation testsEvtl. wieder frei @dicethedev hat das vor 9 Tagen übernommen, und es ist kein Pull Request offen. Offen
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 62/100
lambdaclass/ethlambda#725 · 2 Kommentare ·
Maintainer antworten meist innerhalb von 6 Tagen
-
Handle malformed DB dataEvtl. wieder frei @dicethedev hat das vor 115 Tagen übernommen, und es ist kein Pull Request offen. Offen
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 76/100
lambdaclass/ethlambda#529 · 4 Kommentare ·
Maintainer antworten meist innerhalb von 6 Tagen
-
Document architectural choicesEvtl. wieder frei @dicethedev hat das vor 115 Tagen übernommen, und es ist kein Pull Request offen. Offen
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 68/100
lambdaclass/ethlambda#521 · 2 Kommentare ·
Maintainer antworten meist innerhalb von 6 Tagen
Alle Issues in lambdaclass/ethlambda
Ähnliche Issues
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 84/100
antithesishq/bombadil#473 ·
Maintainer antworten meist innerhalb von 2 Tagen
-
bench/api.sh exec test fails with curl exit 52, and --ignore-failure still records the timingsOffenbug
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 72/100
libracoder/kiri#669 ·
Maintainer antworten meist innerhalb von 1 Tag
-
Schwierigkeit 1/5 Unter einer Stunde Anfängerfreundlichkeit 88/100
Maintainer antworten meist innerhalb von 5 Tagen
-
autofixer: follow-up
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 75/100
tursodatabase/turso#12217 ·
Maintainer antworten meist innerhalb von 1 Tag
-
Declare the CMS schema library in the optional recipients extraEvtl. vergeben Ein verknüpfter Pull Request ist offen oder bereits gemergt. Offenarea:python in-progress
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 82/100
yhay81/pyropdf#1005 · 2 Kommentare ·