Distinguish upcoming peer review from a closed evaluation window (CMP drift)
维护者通常 1 天内回复
还没有人认领这个 Issue。
评估
- 难度
- 4/5
- 预计耗时
- 3-5 天
- 新手友好度
- 45/100
调研方向
Read _docs/specs/04-courses-and-cohorts.md, _docs/specs/02-url-link-seo-compatibility.md, and _docs/specs/10-verification-strategy.md, then inspect courses/views/project_eval.py and courses/templates/projects/eval.html. Trace the existing state and cohort date presentation helpers before adjusting the upcoming, open, and completed branches. Done means the focused Django state/auth matrix and applicable Playwright checks pass while preserving the listed access, privacy, and route behavior.
由索引模型根据 Issue 内容生成。
描述
Problem and provenance
The website describes every project outside PEER_REVIEWING as closed; learners see an incorrect closed-window message before review starts. CMP #290, commit 3256766, and #291, commit 89ea396, distinguish upcoming from completed review and show timing to anonymous visitors too. Intake 835873e9-5f63-4e5d-b0f9-0773e1d562b6 authorizes small PRs and candidate-only delivery.
Authority
_docs/specs/04-courses-and-cohorts.md: preserved project review behavior, cohort-specific assessment ownership, canonical cohort routes and private review responses._docs/specs/02-url-link-seo-compatibility.md: canonical course/cohort routes._docs/specs/10-verification-strategy.md;_docs/ci/change-selective-ci.md.
Scope
Adapt the two CMP changes to courses/views/project_eval.py and the website design-system template courses/templates/projects/eval.html. On /courses/<family>/<identifier>/projects/<project>/eval use an explicit not-open state for CLOSED and COLLECTING_SUBMISSIONS; PEER_REVIEWING remains open, COMPLETED remains closed. Display the available peer-review start/deadline using existing cohort dates and presentation helpers. Keep anonymous sign-in guidance while also showing upcoming timing. Never change grading, assignment, scoring or authorization state.
Acceptance criteria
- CLOSED and COLLECTING_SUBMISSIONS projects show that peer review has not opened yet, for anonymous visitors and authenticated learners with or without a submission; do not incorrectly say the review form is closed.
- Available review start/deadline timing is presented with the existing date/time conventions; missing timing renders safe readable copy without broken or invented dates.
- PEER_REVIEWING preserves required and volunteer review navigation and learner-specific context. COMPLETED preserves closed-window behavior.
- GET remains read-only; cohort isolation, login destinations and private/no-store response policy remain covered.
- Focused Django state/auth matrix and applicable Playwright checks pass; independent tester captures and inspects desktop/mobile screenshots for upcoming anonymous and authenticated states and verifies existing open/completed branches.
- Generate exact base/head verification plan; independent tester and PM acceptance; required checks green on the PR exact head before merge; candidate-only deployment verified at prod.datatalks.club.
Non-goals and boundaries
No new timeline/state machine, emails, schedules, migrations, shared-package changes or rollout to current datatalks.club. CMP is read-only; courses.datatalks.club, join.datatalks.club, signup emails and Slack settings stay unchanged. No real-user emails. No dependency on the other drift ports.
- 主要语言
- Python
- 星标
- 0
- 派生
- 0
- 平均合并
- 37 分钟
- 30 天内合并 PR
- 36
环境准备
- 提供 Dockerfile 或 Docker Compose 文件
- 没有 Pull Request 模板
- 没有贡献指南
从这里开始
- 先读完整个 Issue,再读项目的贡献指南。
- 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
- Fork 仓库,在一个分支上完成修改。
- 提交 Pull Request,并在描述里引用这个 Issue 编号。
DataTalksClub/website 的其他 Issue
-
bug infra operations P1 testing
难度 2/5 1-3 小时 新手友好度 72/100
DataTalksClub/website#329 ·
维护者通常 1 天内回复
-
bug content data-migration documentation events operations P1
难度 2/5 1-3 小时 新手友好度 84/100
DataTalksClub/website#327 ·
维护者通常 1 天内回复
-
bug frontend P0 testing
难度 2/5 1-3 小时 新手友好度 90/100
DataTalksClub/website#300 · 7 条评论 ·
维护者通常 1 天内回复
-
bug data-migration events P0 testing
难度 2/5 1-3 小时 新手友好度 72/100
DataTalksClub/website#295 · 6 条评论 ·
维护者通常 1 天内回复
-
Show pending evaluation instead of premature project failure and zero scores (CMP drift)可能已有人在做 关联的 PR 仍在进行中或已合并。 未关闭bug courses frontend P1
难度 4/5 3-5 天 新手友好度 35/100
DataTalksClub/website#525 · 2 条评论 ·
维护者通常 1 天内回复
查看 DataTalksClub/website 的全部 Issue
相似的 Issue
-
needs-triage
难度 1/5 1 小时以内 新手友好度 88/100
flashinfer-ai/flashinfer#9803 ·
维护者通常 1 天内回复
-
bug frontend good first issue help wanted
难度 2/5 1-3 小时 新手友好度 72/100
oscarbol09/thesisforge#61 ·
-
api bug performance
难度 2/5 1-3 小时 新手友好度 82/100
oscarbol09/audiobard#159 ·
-
area:web p2 product:business triage:active type:bug
难度 1/5 1 小时以内 新手友好度 89/100
cuadrao-ai/argus#2328 ·
维护者通常 1 天内回复
-
bug frontend good first issue help wanted
难度 2/5 1-3 小时 新手友好度 88/100
nikhilb2/simple_invoicing#907 ·