Account for allocated vs unallocated inventory
Maintainer antworten meist innerhalb von 1 Tag
Bewertung
Dieses Issue wurde noch nicht bewertet.
Beschreibung
This issue is to track exploration around this whole problem domain, so that we have some place to take notes and link PRs against. Any work we do immediately will need to have a neutral or considered impact on users.
- Architecture design of the event level tracking of allocated
- Looking at reports for allocated inventory
- Maybe this only matters for audits
- Make sure people are marking their distributions as "completed" -- encourage them, show them the consequences of not doing it
- Lift up actions into the main distribution row -- button for "complete"
Survey current state of world
- How many / how often / how recent are incomplete distributions?
Architecture design of the event level tracking of allocated
- Add a new datapoint of allocated inventory to events
- Show unallocated everywhere we currently show quantities
Fix audits/adjustments:
- In Audit, give error if they adjust the inventory to below allocated total
- In Adjustments, give error if they adjust the inventory to below the allocated total
Improve distribution completion compliance
- Show a persistent non-dismissable banner when there are incomplete distributions past their estimated distribution date
- Make it easy to mark distributions as complete by bringing the button onto the distribution list page
Comment from CL:
- I worry that we're setting ourselves up for a whole lot of pain to support what sounds like a pretty non-standard business practice. 2. Some of the things in the above will end up breaking the system if, for example, they have a theft.
Straw Man from CL:
Simplest? Way to handle this As much as possible restrict changes to just the audit process
On “New Audit”
Give a strong suggestion that they complete any distributions that have “left the building” as far as auditing is confined.
On saved audits:
When we have a saved-in-progress audit
I believe we show the Quantity in Records. This should show “Unallocated”. TBD: also show “allocated” as the number of that item in distributions that have not been completed, and perhaps a “Physical expected” which would be the sum
Warn them again on confirming?
Similar changes on confirmed audits
On finalizing audit:
Have a Big Ol’ “You must confirm that all distributions that have “left the building” are marked complete before finalizing the audit, or your new inventory available for allocation will be wrong,
give a list of all the incomplete distributions
Allow them to mark them all complete with 1 button or to handle them individually (possibly by going back to the distributions list).
If there are any incomplete distributions, they have to say: “I acknowledge that the items earmarked for not-completed distributions are included in the physical counts for this audit”;
Then, when they hit the final finalize, the new values in the inventory will be calculated to be the physical values - the earmarked values.
Historical audits
What are the implications for looking at historical audits — not just the ones we have now, but the new ones looking back?
We’ll want to have a “physical” column, an “unallocated in records” and a “allocated in records” Maybe put a “Current” on those, to keep it clear.
We'll also want a disclaimer re before we implement this.
Impact:
Maybe new fields on Audit, maybe not?
At the end of the day, all the inventory numbers are still unallocated.
Does that solve the problem?
- Vorherrschende Sprache
- Ruby
- Sterne
- 594
- Forks
- 596
- Ø Merge
- 4 T. 10 Std.
- Gemergte PRs (30 T.)
- 13
Entwicklungsumgebung
Startet den Dev-Container des Projekts im Browser, mit Ihrem eigenen GitHub-Konto.
- Kein Dockerfile und keine Docker-Compose-Datei
- Hat eine Pull-Request-Vorlage
- Beitragsleitfaden lesen
Erste Schritte
- Lesen Sie das ganze Issue und danach den Beitragsleitfaden des Projekts.
- Schreiben Sie ins Issue, dass Sie es übernehmen — das erspart doppelte Arbeit.
- Forken Sie das Repository und arbeiten Sie in einem Branch.
- Öffnen Sie einen Pull Request, der die Issue-Nummer nennt.
Mehr aus rubyforgood/human-essentials
-
Export button on annual report should revert to "Export Report" from "Please Wait..." once report generated.Evtl. vergeben @costajohnt hat das vor 22 Tagen übernommen. Offen
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 74/100
rubyforgood/human-essentials#5691 · 1 Kommentar · 1 zugewiesene Person ·
Maintainer antworten meist innerhalb von 1 Tag
-
On Distributions, fix line-item column headers wrapping and alignment on narrow screensEvtl. vergeben @Sinkleberg hat das vor 5 Tagen übernommen. Offen
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 68/100
rubyforgood/human-essentials#5603 · 8 Kommentare · 1 zugewiesene Person ·
Maintainer antworten meist innerhalb von 1 Tag
-
Proposal: forecast-based reorder points and shortage allocation ("Replenishment Planner")Evtl. vergeben @arnavt687 hat das vor 24 Tagen übernommen. Offen
Schwierigkeit 5/5 Über eine Woche Anfängerfreundlichkeit 25/100
rubyforgood/human-essentials#5728 · 3 Kommentare ·
Maintainer antworten meist innerhalb von 1 Tag
-
Ruby for Good 2026 DC stale
rubyforgood/human-essentials#5694 · 2 Kommentare ·
Maintainer antworten meist innerhalb von 1 Tag
-
Add optional phone number to users (esp Partner Users)Evtl. vergeben @costajohnt hat das vor 26 Tagen übernommen. OffenDifficulty—Intermediate Ruby for Good 2026 DC
Schwierigkeit 3/5 1-2 Tage Anfängerfreundlichkeit 68/100
rubyforgood/human-essentials#5687 ·
Maintainer antworten meist innerhalb von 1 Tag
Alle Issues in rubyforgood/human-essentials
Ähnliche Issues
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 66/100
Maintainer antworten meist innerhalb von 1 Tag
-
enhancement help wanted
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 78/100
ecosyste-ms/repos#1215 ·
Maintainer antworten meist innerhalb von 1 Tag
-
bug
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 70/100
WikiEducationFoundation/WikiEduDashboard#7157 ·
Maintainer antworten meist innerhalb von 1 Tag
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 82/100
Maintainer antworten meist innerhalb von 1 Tag
-
enhancement good first issue
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 75/100
r-uby-dev/llm#292 · 2 Kommentare ·
Maintainer antworten meist innerhalb von 1 Tag