Account for allocated vs unallocated inventory
Los mantenedores suelen responder en 1 día
Evaluación
Este issue todavía no se ha evaluado.
Descripción
This issue is to track exploration around this whole problem domain, so that we have some place to take notes and link PRs against. Any work we do immediately will need to have a neutral or considered impact on users.
- Architecture design of the event level tracking of allocated
- Looking at reports for allocated inventory
- Maybe this only matters for audits
- Make sure people are marking their distributions as "completed" -- encourage them, show them the consequences of not doing it
- Lift up actions into the main distribution row -- button for "complete"
Survey current state of world
- How many / how often / how recent are incomplete distributions?
Architecture design of the event level tracking of allocated
- Add a new datapoint of allocated inventory to events
- Show unallocated everywhere we currently show quantities
Fix audits/adjustments:
- In Audit, give error if they adjust the inventory to below allocated total
- In Adjustments, give error if they adjust the inventory to below the allocated total
Improve distribution completion compliance
- Show a persistent non-dismissable banner when there are incomplete distributions past their estimated distribution date
- Make it easy to mark distributions as complete by bringing the button onto the distribution list page
Comment from CL:
- I worry that we're setting ourselves up for a whole lot of pain to support what sounds like a pretty non-standard business practice. 2. Some of the things in the above will end up breaking the system if, for example, they have a theft.
Straw Man from CL:
Simplest? Way to handle this As much as possible restrict changes to just the audit process
On “New Audit”
Give a strong suggestion that they complete any distributions that have “left the building” as far as auditing is confined.
On saved audits:
When we have a saved-in-progress audit
I believe we show the Quantity in Records. This should show “Unallocated”. TBD: also show “allocated” as the number of that item in distributions that have not been completed, and perhaps a “Physical expected” which would be the sum
Warn them again on confirming?
Similar changes on confirmed audits
On finalizing audit:
Have a Big Ol’ “You must confirm that all distributions that have “left the building” are marked complete before finalizing the audit, or your new inventory available for allocation will be wrong,
give a list of all the incomplete distributions
Allow them to mark them all complete with 1 button or to handle them individually (possibly by going back to the distributions list).
If there are any incomplete distributions, they have to say: “I acknowledge that the items earmarked for not-completed distributions are included in the physical counts for this audit”;
Then, when they hit the final finalize, the new values in the inventory will be calculated to be the physical values - the earmarked values.
Historical audits
What are the implications for looking at historical audits — not just the ones we have now, but the new ones looking back?
We’ll want to have a “physical” column, an “unallocated in records” and a “allocated in records” Maybe put a “Current” on those, to keep it clear.
We'll also want a disclaimer re before we implement this.
Impact:
Maybe new fields on Audit, maybe not?
At the end of the day, all the inventory numbers are still unallocated.
Does that solve the problem?
- Lenguaje dominante
- Ruby
- Estrellas
- 594
- Forks
- 596
- Merge medio
- 1 d 10 h
- PR fusionados (30 d)
- 11
Preparar el entorno
Inicia el contenedor de desarrollo del proyecto en tu navegador, con tu propia cuenta de GitHub.
- Sin Dockerfile ni archivo de Docker Compose
- Tiene una plantilla de pull request
- Leer la guía de contribución
Primeros pasos
- Lee el issue completo y luego la guía de contribución del proyecto.
- Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
- Haz un fork del repositorio y trabaja en una rama.
- Abre un pull request que haga referencia al número del issue.
Más de rubyforgood/human-essentials
-
Export button on annual report should revert to "Export Report" from "Please Wait..." once report generated.Posiblemente ocupada @costajohnt la tomó hace 14 días. Abierto
Dificultad 2/5 1-3 horas Aptitud para principiantes 74/100
rubyforgood/human-essentials#5691 · 1 comentario · 1 asignado ·
Los mantenedores suelen responder en 1 día
-
stale
Dificultad 2/5 1-3 horas Aptitud para principiantes 68/100
rubyforgood/human-essentials#5603 · 7 comentarios ·
Los mantenedores suelen responder en 1 día
-
Fix typos in comments, docs and spec descriptionsPosiblemente ocupada @geographybuff la tomó hace 2 días. Abierto
Dificultad 1/5 Menos de una hora Aptitud para principiantes 25/100
rubyforgood/human-essentials#5741 · 1 comentario ·
Los mantenedores suelen responder en 1 día
-
Proposal: forecast-based reorder points and shortage allocation ("Replenishment Planner")Posiblemente ocupada @arnavt687 la tomó hace 17 días. Abierto
Dificultad 5/5 Más de una semana Aptitud para principiantes 25/100
rubyforgood/human-essentials#5728 · 3 comentarios ·
Los mantenedores suelen responder en 1 día
-
Ruby for Good 2026 DC stale
rubyforgood/human-essentials#5694 · 2 comentarios ·
Los mantenedores suelen responder en 1 día
Todos los issues de rubyforgood/human-essentials
Issues similares
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 62/100
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 72/100
Homebrew/homebrew-cask#293134 ·
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 72/100
notch8/iiif_print#430 ·
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 65/100
Los mantenedores suelen responder en 1 día
-
ActionText::Content#to_markdown: <br> in a table cell and empty <tr> produce malformed Markdown tablesPosiblemente ocupada @azmi2409 la tomó hoy. Abierto
Dificultad 2/5 1-3 horas Aptitud para principiantes 82/100
Los mantenedores suelen responder en 1 día