jdk25 upgrade
Maintainer antworten meist innerhalb von 2 Tagen
@shroffk arbeitet bereits daran.
Seit 04.8.2026.
Bewertung
Dieses Issue wurde noch nicht bewertet.
Beschreibung
Summary
I am going to close the PR #3839 and re-approach this effort incrementally.
Right now, this migration is blocked by a mesh of related dependency and framework upgrades, and trying to land them in one PR introduces too much change at once for safe review and validation.
Problem
The current JDK 25 migration is not isolated. It pulls in a chain of related upgrades:
- newer JavaFX requires JDK 25
- Spring upgrade is needed for JDK 25 support
- Jackson 3 upgrade is needed for the Spring upgrade path
- Spring Security 6+ upgrade is needed as part of the Spring migration
- Elasticsearch upgrade is needed for Jackson 3 compatibility
- middle-layer service objects need updates, primarily for JSON/XML serialization and deserialization
Because of these dependencies, one PR ends up touching many layers of the system at once. That makes it difficult to:
- review effectively
- test confidently
- identify regressions quickly
- merge incrementally
Proposed approach
We should split this migration into a sequence of focused efforts instead of one large PR.
low-risk Spring service migration ( alarm-logger, alarm-config-logger )
- migrate the lowest-complexity Spring service first
- use that work to validate the Spring/JDK upgrade path
- confirm compile, test, and packaging behavior before moving on
high-risk Spring service migration (save-restore)
- migrate the most complex service last
- handle:
- Jakarta namespace changes
- Spring Security updates
- Elasticsearch compatibility
- Jackson 3 integration
- serialization/deserialization updates in service-layer objects
shared dependency reconciliation ( entire phoebus project )
- reconcile shared/root Spring and related dependency versions
- remove temporary overrides introduced during the transition
- validate all Spring services together
Suggested work breakdown
This effort will likely need to be split across multiple PRs, including some combination of:
- define and document the upgrade order for JDK 25, JavaFX, Spring, Jackson, Spring Security, and Elasticsearch
- migrate low-risk Spring services first
- upgrade Spring-dependent services iteratively
- update Spring Security usage as required by the newer Spring line
- update Jackson-related serialization/deserialization code
- update Elasticsearch integration for compatibility
- update middle-layer service objects impacted by JSON/XML mapping changes
- run targeted testing after each step
- run broader regression testing before final convergence on JDK 25
Notes
A more detailed upgrade analysis already exists and can be used as the implementation plan for follow-up issues/PRs, especially for:
- Spring Boot upgrade sequencing
- save-and-restore migration details
- springdoc changes
- Spring Security API updates
- Elasticsearch/Jackson compatibility
- Jakarta namespace migration
- Vorherrschende Sprache
- Java
- Sterne
- 130
- Forks
- 132
- Ø Merge
- 2 T. 11 Std.
- Gemergte PRs (30 T.)
- 19
Entwicklungsumgebung
- Kein Dockerfile und keine Docker-Compose-Datei
- Hat eine Pull-Request-Vorlage
- Kein Beitragsleitfaden
Erste Schritte
- Lesen Sie das ganze Issue und danach den Beitragsleitfaden des Projekts.
- Schreiben Sie ins Issue, dass Sie es übernehmen — das erspart doppelte Arbeit.
- Forken Sie das Repository und arbeiten Sie in einem Branch.
- Öffnen Sie einen Pull Request, der die Issue-Nummer nennt.
Mehr aus ControlSystemStudio/phoebus
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 62/100
ControlSystemStudio/phoebus#3983 ·
Maintainer antworten meist innerhalb von 2 Tagen
-
Create CONTRIBUTING.mdOffen
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 72/100
ControlSystemStudio/phoebus#3979 ·
Maintainer antworten meist innerhalb von 2 Tagen
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 80/100
ControlSystemStudio/phoebus#3962 ·
Maintainer antworten meist innerhalb von 2 Tagen
-
PVA/SPVA: track SPVA version independently and move XDG keychain dir pva/<ver> -> spva/<n.n.n>Offen
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 65/100
ControlSystemStudio/phoebus#3865 · 1 Kommentar ·
Maintainer antworten meist innerhalb von 2 Tagen
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 52/100
ControlSystemStudio/phoebus#3980 ·
Maintainer antworten meist innerhalb von 2 Tagen
Alle Issues in ControlSystemStudio/phoebus
Ähnliche Issues
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 76/100
checkstyle/checkstyle#22153 ·
Maintainer antworten meist innerhalb von 1 Tag
-
Documentation Needs Triage
Schwierigkeit 1/5 Unter einer Stunde Anfängerfreundlichkeit 78/100
frankframework/frankframework#11908 ·
Maintainer antworten meist innerhalb von 1 Tag
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 68/100
ome/ome-codecs#48 ·
-
Schwierigkeit 1/5 Unter einer Stunde Anfängerfreundlichkeit 90/100
tonihele/OpenKeeper#672 ·
Maintainer antworten meist innerhalb von 4 Tagen
-
Schwierigkeit 2/5 1-3 Stunden Anfängerfreundlichkeit 72/100
eclipse-ee4j/angus-mail#224 ·