Close the CLI contract migration: update the ADR notes and the EPIC
维护者通常 1 天内回复
还没有人认领这个 Issue。
评估
- 难度
- 4/5
- 预计耗时
- 3-5 天
- 新手友好度
- 52/100
- Issue 类型
- 文档
- 描述清晰度
- 基本清楚
- 活跃度
- 活跃
- 技术栈
- markdown, rust
调研方向
Read the two ADRs named in the issue and the full specification that the spec PR will add under docs/issues/open/; inspect the EPIC #2758 subissues and the CLI contract audit evidence. Update the ADR notes and EPIC statuses, acceptance verification, and progress log, then move the EPIC spec to docs/issues/closed/. Done means the ADR table matches the code and the acceptance criteria cite a fresh audit showing compliance or tracking any leftover with an issue.
由索引模型根据 Issue 内容生成。
描述
Part of EPIC #2758. Order 11 of 11, wave last.
Goal
After the migration issues are merged, remove the 'currently non-compliant' notes from the ADR binary table and close the EPIC bookkeeping.
Background
Sibling issues do not edit the ADR table (only issue 1 and this one do), so the table still says some tools are non-compliant when they are done. This is the close-out PR described by the epic-coordination process: move the EPIC spec to docs/issues/closed/, update the Subissues table and acceptance verification. Also remove the scripts-audit follow-ups that became issues, and record leftover non-compliance with its issue.
The contract in short: see the ADRs docs/adrs/20260519000000_define_global_cli_output_contract.md and docs/adrs/20261106102632_scope_the_cli_output_contract_and_keep_exit_codes_to_zero_one_two.md.
In scope
- Update the ADR table notes to match the final state.
- Update the EPIC spec: statuses, acceptance verification, progress log; move it to
docs/issues/closed/. - Verify with a fresh audit that no in-scope tool is non-compliant, or that the leftover is recorded with an issue.
Out of scope
- Any code change.
Acceptance criteria
- The ADR table matches the code.
- The EPIC's acceptance criteria are checked with evidence.
- The EPIC spec is under
docs/issues/closed/.
The full specification (implementation plan, verification plan, files this issue may touch) is added by the spec PR under docs/issues/open/.
- 主要语言
- Rust
- 星标
- 532
- 派生
- 56
- 平均合并
- 11 小时 20 分钟
- 30 天内合并 PR
- 282
环境准备
这个项目没有提供开发容器、Dockerfile 或贡献指南,环境需要你自己搭建:先看它的 README,通用步骤见我们的新手贡献指南。
从这里开始
- 先读完整个 Issue,再读项目的贡献指南。
- 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
- Fork 仓库,在一个分支上完成修改。
- 提交 Pull Request,并在描述里引用这个 Issue 编号。
torrust/torrust-tracker 的其他 Issue
-
Bug
难度 2/5 1-3 小时 新手友好度 78/100
torrust/torrust-tracker#3080 ·
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 75/100
torrust/torrust-tracker#3069 ·
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 68/100
torrust/torrust-tracker#3058 ·
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 68/100
torrust/torrust-tracker#2978 ·
维护者通常 1 天内回复
-
Bug
难度 2/5 1-3 小时 新手友好度 73/100
torrust/torrust-tracker#2332 ·
维护者通常 1 天内回复
查看 torrust/torrust-tracker 的全部 Issue
相似的 Issue
-
难度 1/5 1 小时以内 新手友好度 90/100
维护者通常 1 天内回复
-
marketing
难度 2/5 1-3 小时 新手友好度 84/100
维护者通常 1 天内回复
-
difficulty: easy docs help wanted tooling
难度 2/5 1-3 小时 新手友好度 83/100
-
bug help wanted ui
难度 2/5 1-3 小时 新手友好度 85/100
userFRM/egui-charts#4386 ·
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 68/100
eliasstravik/herdr-projects#1605 · 1 条评论 ·