Close the CLI contract migration: update the ADR notes and the EPIC

未关闭
#2,770 0 条评论 0 个 reaction 已指派 0 人 在 GitHub 查看

维护者通常 1 天内回复

还没有人认领这个 Issue。

评估

难度
4/5
预计耗时
3-5 天
新手友好度
52/100
Issue 类型
文档
描述清晰度
基本清楚
活跃度
活跃
技术栈
markdown, rust
领域
documentation

调研方向

Read the two ADRs named in the issue and the full specification that the spec PR will add under docs/issues/open/; inspect the EPIC #2758 subissues and the CLI contract audit evidence. Update the ADR notes and EPIC statuses, acceptance verification, and progress log, then move the EPIC spec to docs/issues/closed/. Done means the ADR table matches the code and the acceptance criteria cite a fresh audit showing compliance or tracking any leftover with an issue.

由索引模型根据 Issue 内容生成。

描述

Part of EPIC #2758. Order 11 of 11, wave last.

Goal

After the migration issues are merged, remove the 'currently non-compliant' notes from the ADR binary table and close the EPIC bookkeeping.

Background

Sibling issues do not edit the ADR table (only issue 1 and this one do), so the table still says some tools are non-compliant when they are done. This is the close-out PR described by the epic-coordination process: move the EPIC spec to docs/issues/closed/, update the Subissues table and acceptance verification. Also remove the scripts-audit follow-ups that became issues, and record leftover non-compliance with its issue.

The contract in short: see the ADRs docs/adrs/20260519000000_define_global_cli_output_contract.md and docs/adrs/20261106102632_scope_the_cli_output_contract_and_keep_exit_codes_to_zero_one_two.md.

In scope

  • Update the ADR table notes to match the final state.
  • Update the EPIC spec: statuses, acceptance verification, progress log; move it to docs/issues/closed/.
  • Verify with a fresh audit that no in-scope tool is non-compliant, or that the leftover is recorded with an issue.

Out of scope

  • Any code change.

Acceptance criteria

  • The ADR table matches the code.
  • The EPIC's acceptance criteria are checked with evidence.
  • The EPIC spec is under docs/issues/closed/.

The full specification (implementation plan, verification plan, files this issue may touch) is added by the spec PR under docs/issues/open/.

主要语言
Rust
星标
532
派生
56
平均合并
11 小时 20 分钟
30 天内合并 PR
282

环境准备

这个项目没有提供开发容器、Dockerfile 或贡献指南,环境需要你自己搭建:先看它的 README,通用步骤见我们的新手贡献指南。

从这里开始

  1. 先读完整个 Issue,再读项目的贡献指南。
  2. 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
  3. Fork 仓库,在一个分支上完成修改。
  4. 提交 Pull Request,并在描述里引用这个 Issue 编号。

torrust/torrust-tracker 的其他 Issue

查看 torrust/torrust-tracker 的全部 Issue

相似的 Issue

更多 Rust Issue

把新 issue 发到你的邮箱

精选适合新手参与的 GitHub issue 摘要。