Close the CLI contract migration: update the ADR notes and the EPIC

Abierto
#2,770 0 comentarios 0 reacciones 0 asignados Ver en GitHub

Los mantenedores suelen responder en 1 día

Nadie ha tomado este issue todavía.

Evaluación

Dificultad
4/5
Tiempo estimado
3-5 días
Aptitud para principiantes
52/100
Tipo de issue
Documentación
Claridad
Bastante claro
Estado de actividad
Activo
Stack tecnológico
markdown, rust

Línea de trabajo

Read the two ADRs named in the issue and the full specification that the spec PR will add under docs/issues/open/; inspect the EPIC #2758 subissues and the CLI contract audit evidence. Update the ADR notes and EPIC statuses, acceptance verification, and progress log, then move the EPIC spec to docs/issues/closed/. Done means the ADR table matches the code and the acceptance criteria cite a fresh audit showing compliance or tracking any leftover with an issue.

Escrito por el modelo de indexación a partir del texto del issue.

Descripción

Part of EPIC #2758. Order 11 of 11, wave last.

Goal

After the migration issues are merged, remove the 'currently non-compliant' notes from the ADR binary table and close the EPIC bookkeeping.

Background

Sibling issues do not edit the ADR table (only issue 1 and this one do), so the table still says some tools are non-compliant when they are done. This is the close-out PR described by the epic-coordination process: move the EPIC spec to docs/issues/closed/, update the Subissues table and acceptance verification. Also remove the scripts-audit follow-ups that became issues, and record leftover non-compliance with its issue.

The contract in short: see the ADRs docs/adrs/20260519000000_define_global_cli_output_contract.md and docs/adrs/20261106102632_scope_the_cli_output_contract_and_keep_exit_codes_to_zero_one_two.md.

In scope

  • Update the ADR table notes to match the final state.
  • Update the EPIC spec: statuses, acceptance verification, progress log; move it to docs/issues/closed/.
  • Verify with a fresh audit that no in-scope tool is non-compliant, or that the leftover is recorded with an issue.

Out of scope

  • Any code change.

Acceptance criteria

  • The ADR table matches the code.
  • The EPIC's acceptance criteria are checked with evidence.
  • The EPIC spec is under docs/issues/closed/.

The full specification (implementation plan, verification plan, files this issue may touch) is added by the spec PR under docs/issues/open/.

Lenguaje dominante
Rust
Estrellas
532
Forks
56
Merge medio
11 h 20 min
PR fusionados (30 d)
282

Preparar el entorno

Este proyecto no incluye contenedor de desarrollo, Dockerfile ni guía de contribución, así que la configuración corre por tu cuenta: empieza por su README y consulta nuestra guía para la primera contribución para los pasos generales.

Primeros pasos

  1. Lee el issue completo y luego la guía de contribución del proyecto.
  2. Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
  3. Haz un fork del repositorio y trabaja en una rama.
  4. Abre un pull request que haga referencia al número del issue.

Más de torrust/torrust-tracker

Todos los issues de torrust/torrust-tracker

Issues similares

Más issues de Rust

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.