SES: confirm cutover complete
维护者通常 1 天内回复
还没有人认领这个 Issue。
评估
- 难度
- 3/5
- 预计耗时
- 1-2 天
- 新手友好度
- 35/100
- Issue 类型
- 功能
- 描述清晰度
- 基本清楚
- 活跃度
- 活跃
- 技术栈
- aws
- 领域
- cloud, infrastructure
调研方向
Start by reading the prerequisite migration work in #2929, then review SES delivery metrics for the parallel period, including delivered rate, bounces, and complaints. Done means recording the cutover date when metrics are healthy; if problems surfaced, document them and point the SMTP_* variables back at SendGrid.
由索引模型根据 Issue 内容生成。
描述
Depends on #2929.
- Review SES delivery metrics for the parallel period (delivered rate, bounces, complaints)
- If healthy, declare the cutover complete and record the date here
- If problems surfaced, document them and revert to SendGrid while we investigate
Rollback at any point: point the SMTP_* vars back at SendGrid.
- 主要语言
- Ruby
- 星标
- 104
- 派生
- 205
- 平均合并
- 1 天 4 小时
- 30 天内合并 PR
- 77
环境准备
- 提供 Dockerfile 或 Docker Compose 文件
- 没有 Pull Request 模板
- 阅读贡献指南
从这里开始
- 先读完整个 Issue,再读项目的贡献指南。
- 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
- Fork 仓库,在一个分支上完成修改。
- 提交 Pull Request,并在描述里引用这个 Issue 编号。
codebar/planner 的其他 Issue
-
enhancement
难度 2/5 1-3 小时 新手友好度 76/100
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 68/100
维护者通常 1 天内回复
-
难度 4/5 3-5 天 新手友好度 56/100
维护者通常 1 天内回复
-
InvitationManager silently no-ops on non-invitable events/workshops while controllers flash success未关闭bug
难度 3/5 1-2 天 新手友好度 72/100
维护者通常 1 天内回复
-
refactoring tech debt
难度 4/5 3-5 天 新手友好度 72/100
维护者通常 1 天内回复
相似的 Issue
-
难度 2/5 1-3 小时 新手友好度 84/100
-
难度 2/5 1-3 小时 新手友好度 72/100
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 90/100
维护者通常 3 天内回复
-
难度 2/5 1-3 小时 新手友好度 86/100
mastodon/mastodon#40755 · 1 条评论 · 1 个 reaction ·
维护者通常 1 天内回复
-
L: docker L: elm L: github:actions L: helm L: ruby:bundler
难度 2/5 1-3 小时 新手友好度 85/100
dependabot/dependabot-core#16425 ·
维护者通常 2 天内回复