InvitationManager silently no-ops on non-invitable events/workshops while controllers flash success
维护者通常 1 天内回复
还没有人认领这个 Issue。
评估
调研方向
Start at Admin::WorkshopsController#invite and Admin::EventsController#invite, then trace the three InvitationManager methods and their handle_asynchronously calls. Confirm that non-invitable targets produce a warning without enqueueing, while invitable targets retain the current success flow and email behavior.
由索引模型根据 Issue 内容生成。
描述
Problem
Three InvitationManager methods guard with error strings — send_event_emails, send_workshop_emails, send_virtual_workshop_emails all return 'The X is not invitable' unless x.invitable?. All three run via handle_asynchronously, so the return value is discarded by the DelayedJob worker. The controllers (Admin::WorkshopsController#invite, Admin::EventsController#invite) ignore the return anyway and flash "Invitations will be emailed out soon." unconditionally.
Net effect: when the target isn't invitable, nothing is sent and nobody learns — the flash lies.
Proposed change
- Check
invitable?in the controllers before enqueueing and flash a warning instead of the success message when it's false. (Raising inside the async method can't fix the flash — the raise happens after the redirect.) - Remove the now-dead string returns from
InvitationManager; the internal batch-abort strings (start_invitation_batch→return result if result.is_a?(String)) may stay as internal control flow — implementer's call.
Acceptance
- Inviting to a non-invitable event/workshop shows a warning flash and enqueues nothing.
- Inviting to an invitable one behaves as today.
- 主要语言
- Ruby
- 星标
- 104
- 派生
- 205
- 平均合并
- 1 天 2 小时
- 30 天内合并 PR
- 77
环境准备
- 提供 Dockerfile 或 Docker Compose 文件
- 没有 Pull Request 模板
- 阅读贡献指南
从这里开始
- 先读完整个 Issue,再读项目的贡献指南。
- 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
- Fork 仓库,在一个分支上完成修改。
- 提交 Pull Request,并在描述里引用这个 Issue 编号。
codebar/planner 的其他 Issue
-
enhancement
难度 2/5 1-3 小时 新手友好度 76/100
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 68/100
维护者通常 1 天内回复
-
难度 4/5 3-5 天 新手友好度 56/100
维护者通常 1 天内回复
-
refactoring tech debt
难度 4/5 3-5 天 新手友好度 72/100
维护者通常 1 天内回复
-
refactoring tech debt
难度 3/5 1-2 天 新手友好度 68/100
维护者通常 1 天内回复
相似的 Issue
-
难度 2/5 1-3 小时 新手友好度 90/100
维护者通常 3 天内回复
-
enhancement
难度 2/5 1-3 小时 新手友好度 68/100
维护者通常 2 天内回复
-
难度 2/5 1-3 小时 新手友好度 85/100
jetrockets/jet_ui#47 ·
-
难度 2/5 1-3 小时 新手友好度 84/100
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 76/100
FreeCAD/homebrew-freecad#870 ·
维护者通常 1 天内回复