Potential Issue with Offshore Substation Cost Data

未关闭
#292 1 条评论 0 个 reaction 已指派 0 人 在 GitHub 查看

还没有人认领这个 Issue。

评估

难度
2/5
预计耗时
1-3 小时
新手友好度
48/100
Issue 类型
缺陷
描述清晰度
基本清楚
活跃度
活跃
技术栈
python
领域
data

调研方向

Start by comparing the offshore wind AC and DC substation entries in costs_2025 with the values in the linked DEA Energy Transport Datasheet, section “1.8 el substations.” Check whether the platform and substation costs are being combined in each entry. Document whether the listed totals match the source values and explain the interpretation in the issue thread.

由索引模型根据 Issue 内容生成。

描述

Image

As I understand it, the DEA Energy Transport Datasheet, under “1.8 el substations”, lists the investment cost for offshore wind AC substations as either 600 or 250 EUR/kW, depending on whether the platform is included. However, in PyPSA's technology-data, the cost in costs_2025 is 850 EUR/kW, which appears to be the sum of these two values. The same issue seems to apply to offshore wind DC substations, where the cost is 1,070 EUR/kW.

Could you please let me know if my understanding is correct?

energy_transport_datasheet - 08.xlsx

主要语言
Python
星标
135
派生
61
平均合并
8 天 11 小时
30 天内合并 PR
2

环境准备

  • 没有 Dockerfile 或 Docker Compose 文件
  • 有 Pull Request 模板
  • 没有贡献指南

从这里开始

  1. 先读完整个 Issue,再读项目的贡献指南。
  2. 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
  3. Fork 仓库,在一个分支上完成修改。
  4. 提交 Pull Request,并在描述里引用这个 Issue 编号。

PyPSA/technology-data 的其他 Issue

查看 PyPSA/technology-data 的全部 Issue

相似的 Issue

更多 Python Issue

把新 issue 发到你的邮箱

精选适合新手参与的 GitHub issue 摘要。