Potential Issue with Offshore Substation Cost Data

オープン
#292 コメント 1 件 リアクション 0 件 担当者 0 名 GitHub で見る

まだ誰も着手していません。

評価

難易度
2/5
見積もり時間
1〜3時間
初心者へのやさしさ
48/100
issue の種類
バグ
明瞭さ
おおむね明確
活発さ
活発
技術スタック
python
領域
data

調査の方向性

Start by comparing the offshore wind AC and DC substation entries in costs_2025 with the values in the linked DEA Energy Transport Datasheet, section “1.8 el substations.” Check whether the platform and substation costs are being combined in each entry. Document whether the listed totals match the source values and explain the interpretation in the issue thread.

索引モデルが issue の本文から書いたものです。

説明

Image

As I understand it, the DEA Energy Transport Datasheet, under “1.8 el substations”, lists the investment cost for offshore wind AC substations as either 600 or 250 EUR/kW, depending on whether the platform is included. However, in PyPSA's technology-data, the cost in costs_2025 is 850 EUR/kW, which appears to be the sum of these two values. The same issue seems to apply to offshore wind DC substations, where the cost is 1,070 EUR/kW.

Could you please let me know if my understanding is correct?

energy_transport_datasheet - 08.xlsx

主要言語
Python
スター
135
フォーク
61
平均マージ
8日 11時間
マージ済み PR(30日)
2

環境構築

  • Dockerfile・Docker Compose ファイルなし
  • プルリクエストのテンプレートあり
  • コントリビューションガイドなし

はじめの一歩

  1. issue を最後まで読み、次にプロジェクトのコントリビューションガイドを読みます。
  2. 着手することを issue にコメントします — 二人が同じ作業をするのを防げます。
  3. リポジトリをフォークし、ブランチを切って変更します。
  4. issue 番号を参照したプルリクエストを送ります。

PyPSA/technology-data のほかの issue

PyPSA/technology-data の issue をすべて見る

似ている issue

Python の issue をもっと見る

新しい issue をメールで受け取る

初心者向けの GitHub issue を短くまとめたダイジェスト。