Skill wording fixes from the retrospectives of seven reviewed pull requests

Open
#2,980 0 comments 0 reactions 0 assignees View on GitHub

Maintainers usually reply within 1 day

Nobody has claimed this yet.

Assessment

Difficulty
4/5
Estimated time
3-5 days
Newbie friendliness
48/100
Issue type
Documentation
Clarity
Mostly clear
Activity status
Active
Tech stack
rust

Research direction

Rebuild the proposed items from the audit records in docs/pr-reviews/ for PRs #2805, #2809, #2810, #2811, #2812, #2813, and #2815; the ranked retrospective list is not committed. Check the skills named open-pull-request and fix-bug, and verify whether later changes already cover each item, including the process-pr-review Workflow wording. Done means the specification documents verified fixes and drops already-fixed items, with one commit per skill and the EPIC table row updated.

Written by the indexing model from the issue text.

Description

Parent EPIC: #2003 - Overhaul: Automation Tools and AI Agent Guardrails

Goal

Apply a batch of small wording fixes to three skills, found by retrospectives of seven reviewed pull requests.

Problem

A retrospective of the reviews of PRs #2805, #2809, #2810, #2811, #2812, #2813 and #2815 (about 146 findings) ranked the causes. The maintainer approved the triage. Ranks 7 to 9 are skill-text gaps that were grouped into one issue:

  • open-pull-request: extend the commit-id check to thread replies (a reply that cites a commit must cite one that exists on the branch), and add a note to inspect the index after a hook rejects a commit.
  • fix-bug: a checklist: record raw output with the command and the toolchain; run each new test against the old code; name one wrong behaviour that would still pass.
  • Wording gaps: the related-pr convention in specification frontmatter; the reply form for a thread that needs no change; starting an audit record from the template and not from an earlier audit (check whether process-pr-review already says this; its Workflow section now does).

The ranked list was a working file of the retrospective session and is not committed; the specification must rebuild each item from the audit records in docs/pr-reviews/ of those pull requests.

Proposed scope

  • One commit per skill.
  • Drop any item that a later change already fixed, and say so in the specification.

Notes

  • Not started. The order among the sub-issues is decided when a slot is free. The specification and the EPIC table row are written when the work starts.
  • Filed by the EPIC #2003 coordinator session (AI assistant, Claude Code) on 2026-11-19 at the maintainer's request, so the idea is not lost. The details were recovered from that session's earlier notes; the specification must check them again.
Dominant language
Rust
Stars
532
Forks
56
Avg merge
11h 20m
Merged PRs (30d)
282

Getting set up

This project ships no dev container, Dockerfile or contributing guide, so setting up is up to you: start from its README, and see our first-contribution guide for the general steps.

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

More from torrust/torrust-tracker

All issues in torrust/torrust-tracker

Similar issues

More Rust issues

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.