Skill wording fixes from the retrospectives of seven reviewed pull requests

オープン
#2,980 コメント 0 件 リアクション 0 件 担当者 0 名 GitHub で見る

メンテナーはふだん 1 日以内に返信

まだ誰も着手していません。

評価

難易度
4/5
見積もり時間
3〜5日
初心者へのやさしさ
48/100
issue の種類
ドキュメント
明瞭さ
おおむね明確
活発さ
活発
技術スタック
rust

調査の方向性

Rebuild the proposed items from the audit records in docs/pr-reviews/ for PRs #2805, #2809, #2810, #2811, #2812, #2813, and #2815; the ranked retrospective list is not committed. Check the skills named open-pull-request and fix-bug, and verify whether later changes already cover each item, including the process-pr-review Workflow wording. Done means the specification documents verified fixes and drops already-fixed items, with one commit per skill and the EPIC table row updated.

索引モデルが issue の本文から書いたものです。

説明

Parent EPIC: #2003 - Overhaul: Automation Tools and AI Agent Guardrails

Goal

Apply a batch of small wording fixes to three skills, found by retrospectives of seven reviewed pull requests.

Problem

A retrospective of the reviews of PRs #2805, #2809, #2810, #2811, #2812, #2813 and #2815 (about 146 findings) ranked the causes. The maintainer approved the triage. Ranks 7 to 9 are skill-text gaps that were grouped into one issue:

  • open-pull-request: extend the commit-id check to thread replies (a reply that cites a commit must cite one that exists on the branch), and add a note to inspect the index after a hook rejects a commit.
  • fix-bug: a checklist: record raw output with the command and the toolchain; run each new test against the old code; name one wrong behaviour that would still pass.
  • Wording gaps: the related-pr convention in specification frontmatter; the reply form for a thread that needs no change; starting an audit record from the template and not from an earlier audit (check whether process-pr-review already says this; its Workflow section now does).

The ranked list was a working file of the retrospective session and is not committed; the specification must rebuild each item from the audit records in docs/pr-reviews/ of those pull requests.

Proposed scope

  • One commit per skill.
  • Drop any item that a later change already fixed, and say so in the specification.

Notes

  • Not started. The order among the sub-issues is decided when a slot is free. The specification and the EPIC table row are written when the work starts.
  • Filed by the EPIC #2003 coordinator session (AI assistant, Claude Code) on 2026-11-19 at the maintainer's request, so the idea is not lost. The details were recovered from that session's earlier notes; the specification must check them again.
主要言語
Rust
スター
532
フォーク
56
平均マージ
11時間 20分
マージ済み PR(30日)
282

環境構築

このプロジェクトには開発コンテナ、Dockerfile、コントリビューションガイドがありません。まず README を読み、一般的な手順ははじめてのコントリビューションガイドを参照してください。

はじめの一歩

  1. issue を最後まで読み、次にプロジェクトのコントリビューションガイドを読みます。
  2. 着手することを issue にコメントします — 二人が同じ作業をするのを防げます。
  3. リポジトリをフォークし、ブランチを切って変更します。
  4. issue 番号を参照したプルリクエストを送ります。

torrust/torrust-tracker のほかの issue

torrust/torrust-tracker の issue をすべて見る

似ている issue

Rust の issue をもっと見る

新しい issue をメールで受け取る

初心者向けの GitHub issue を短くまとめたダイジェスト。