Add more metadata to FITS headers
Nobody has claimed this yet.
Assessment
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Newbie friendliness
- 25/100
- Issue type
- Feature
- Clarity
- Needs clarification
- Activity status
- Stale
- Domain
- data
Research direction
The issue does not name files, tests, or an entry point. First locate the code that writes FITS headers, then determine which additional metadata is needed for Equatorial files reporting reference frame G; done means the headers contain the intended metadata and the result is double-checked for the next release.
Written by the indexing model from the issue text.
Description
some files, even if in Equatorial, say reference frame is G in the FITS file.
Double-check for next release
- Dominant language
- Jupyter Notebook
- Stars
- 6
- Forks
- 3
- PR merge metrics
- No merged PRs in 30d
Getting set up
This project ships no dev container, Dockerfile or contributing guide, so setting up is up to you: start from its README, and see our first-contribution guide for the general steps.
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from simonsobs/map_based_simulations
-
Difficulty 4/5 3-5 days Newbie friendliness 50/100
-
[mbs-0021] SAT beamsOpen
Difficulty 5/5 Over a week Newbie friendliness 25/100
-
Write SO map based simulations paperMay be free again @zonca claimed this 2541 days ago, and no pull request is open. Open
simonsobs/map_based_simulations#25 · 9 comments · 1 assignee ·
All issues in simonsobs/map_based_simulations
Similar issues
-
Difficulty 2/5 1-3 hours Newbie friendliness 70/100
EleutherAI/lm-evaluation-harness#4319 ·
Maintainers usually reply within 1 day
-
needs triage
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 70/100
cowprotocol/token-lists#1533 ·
Maintainers usually reply within 7 days
-
Difficulty 2/5 1-3 hours Newbie friendliness 80/100
PathOfBuildingCommunity/PathOfBuilding-PoE2#2560 ·
Maintainers usually reply within 4 days
-
check:passed streams:add
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
Maintainers usually reply within 1 day