[Feature request] Project-controlling through collections and Roadmap

Aberta
#397 1 comentário 0 reações 0 responsáveis Ver no GitHub

Mantenedores costumam responder em até 1 dia

Ninguém assumiu esta issue ainda.

Avaliação

Dificuldade
4/5
Tempo estimado
3-5 dias
Facilidade para iniciantes
22/100
Tipo de issue
Funcionalidade
Clareza
Razoavelmente clara
Status de atividade
Ativa
Stack de tecnologia
go
Domínio
backend, frontend

Direção de pesquisa

This is a multi-part feature request covering roadmap collapse/expand, an iterations toggle, user indicators on roadmap items, and a row height offset fix. Start from the roadmap view in the Svelte frontend and the Go handlers that serve roadmap data, but the payload does not name specific files. Done would need the maintainers to agree on scope, since it bundles several separate changes.

Escrita pelo modelo de indexação a partir do texto da issue.

Descrição

fixed-0.9.3

In our constellation we differentiate between two workspace types: client-space and product-space.

client-space has several epics with the work item type client-project and start and end dates. Those cluster the todos for this "project phase".

product-space has a few epics with the work item type internal-project with start and end dates. For the product-space we often use iterations to cluster items instead of creating an interal-project epic (depends on the scope and context of the project).

In theory we wanted to visualize what projects (internal and client) are currently overlapping to establish an overview that can be filtered by person - or used for planning (extending project phases, shortening them, delaying them etc, distributing sub-tasks throughout the epic phase)

To fully utilize this idea we need the option to:
  • collapse/expand all tasks feature like in the tree-view for roadmaps.
  • adding a toggle to enable iterations in the overview
    • Without the iterations in the roadmap we would need to create a dummy task for the iteration and script some automatic function that syncs the iteration items as child items of this card along with the dates
  • adding a user indicator to the roadmap item; referencing issue #285
  • fixing the height offset of item to timeline row
Image
Linguagem predominante
Go
Estrelas
421
Forks
50
Merge médio
17h 34min
PRs com merge (30d)
80

Preparar o ambiente

Primeiros passos

  1. Leia a issue inteira e depois o guia de contribuição do projeto.
  2. Comente na issue dizendo que vai assumir — evita que duas pessoas façam o mesmo trabalho.
  3. Faça um fork do repositório e trabalhe em uma branch.
  4. Abra um pull request que referencie o número da issue.

Mais de Windshiftapp/core

Todas as issues de Windshiftapp/core

Issues semelhantes

Mais issues de Go

Receba novas issues na sua caixa de entrada

Um resumo curto de issues do GitHub para quem está começando.