[Feature request] Project-controlling through collections and Roadmap

Abierto
#397 1 comentario 0 reacciones 0 asignados Ver en GitHub

Los mantenedores suelen responder en 1 día

Nadie ha tomado este issue todavía.

Evaluación

Dificultad
4/5
Tiempo estimado
3-5 días
Aptitud para principiantes
22/100
Tipo de issue
Nueva funcionalidad
Claridad
Bastante claro
Estado de actividad
Activo
Stack tecnológico
go
Área
backend, frontend

Línea de trabajo

This is a multi-part feature request covering roadmap collapse/expand, an iterations toggle, user indicators on roadmap items, and a row height offset fix. Start from the roadmap view in the Svelte frontend and the Go handlers that serve roadmap data, but the payload does not name specific files. Done would need the maintainers to agree on scope, since it bundles several separate changes.

Escrito por el modelo de indexación a partir del texto del issue.

Descripción

fixed-0.9.3

In our constellation we differentiate between two workspace types: client-space and product-space.

client-space has several epics with the work item type client-project and start and end dates. Those cluster the todos for this "project phase".

product-space has a few epics with the work item type internal-project with start and end dates. For the product-space we often use iterations to cluster items instead of creating an interal-project epic (depends on the scope and context of the project).

In theory we wanted to visualize what projects (internal and client) are currently overlapping to establish an overview that can be filtered by person - or used for planning (extending project phases, shortening them, delaying them etc, distributing sub-tasks throughout the epic phase)

To fully utilize this idea we need the option to:
  • collapse/expand all tasks feature like in the tree-view for roadmaps.
  • adding a toggle to enable iterations in the overview
    • Without the iterations in the roadmap we would need to create a dummy task for the iteration and script some automatic function that syncs the iteration items as child items of this card along with the dates
  • adding a user indicator to the roadmap item; referencing issue #285
  • fixing the height offset of item to timeline row
Image
Lenguaje dominante
Go
Estrellas
421
Forks
50
Merge medio
17 h 34 min
PR fusionados (30 d)
80

Preparar el entorno

Primeros pasos

  1. Lee el issue completo y luego la guía de contribución del proyecto.
  2. Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
  3. Haz un fork del repositorio y trabaja en una rama.
  4. Abre un pull request que haga referencia al número del issue.

Más de Windshiftapp/core

Todos los issues de Windshiftapp/core

Issues similares

Más issues de Go

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.