Hacktoberfest 2026: le issue che i maintainer hanno segnato per ottobre, aperte e adatte ai principianti. Sfoglia le issue Hacktoberfest

Implement Integration Tests for phase_polars ETL Pipeline Workflows

Aperta
#481 0 commenti 0 reazioni 0 assegnatari Vedi su GitHub

I maintainer di solito rispondono entro 1 giorno

Nessuno ha ancora preso questa issue.

Valutazione

Difficoltà
5/5
Tempo stimato
Più di una settimana
Idoneità per principianti
25/100
Tipo di issue
Funzionalità
Chiarezza
Da chiarire
Stato di attività
Ferma
Stack tecnologico
databases, python, sqlite

Direzione di ricerca

Start by locating the phase_polars pipeline, its 17 phases, existing unit tests, and the CI configuration; the issue does not name specific files or test entry points. Then map the load and cross-phase workflows and available test data or database setup. Done means integration tests cover pipeline flow, real I/O, errors and recovery, and run through CI with documented setup and cleanup.

Scritto dal modello di indicizzazione a partire dal testo della issue.

Descrizione

Overview:
Create comprehensive integration tests that validate complete ETL workflows using phase_polars components. These tests will ensure proper data flow between phases, validate real-world scenarios, and catch integration issues that unit tests might miss.

Tech Approach:

Pipeline Integration Tests

  • Test complete transform pipeline (17-phase sequence)
  • Validate data flow between consecutive phases
  • Test pipeline configuration and orchestration
  • Include real-world data scenarios and edge cases

Load Integration Tests

  • Test database loading with real database connections
  • Validate file output formats (CSV, Parquet, SQLite)
  • Test large dataset handling and performance
  • Include rollback and error recovery scenarios

Cross-Phase Integration

  • Test data consistency across phase boundaries
  • Validate schema evolution and compatibility
  • Test parallel processing capabilities
  • Include data quality validation workflows

Acceptance Criteria:

  • Complete ETL pipeline integration tests implemented
  • Load phase integration tests with real I/O operations
  • Cross-phase data flow validation tests
  • Error handling and recovery test scenarios
  • Integration with existing CI/CD pipeline
  • Test data management and cleanup procedures
  • Documentation for integration test execution

Resources & Dependencies:

  • Completion of test structure and unit tests Tickets
  • Access to test databases and file systems
  • Coordination with DevOps for CI/CD integration
Lingua principale
Python
Stelle
10
Fork
4
Merge medio
20h 2m
PR unite (30g)
14

Preparare l'ambiente

  • Include un Dockerfile o un file Docker Compose
  • Nessun modello di pull request
  • Nessuna guida per i contributori

Come iniziare

  1. Leggi tutta la issue e poi la guida ai contributi del progetto.
  2. Commenta sulla issue per dire che te ne occupi tu — evita che due persone facciano lo stesso lavoro.
  3. Fai un fork del repository e lavora su un branch.
  4. Apri una pull request che faccia riferimento al numero della issue.

Altre issue di digital-land/digital-land-python

Tutte le issue di digital-land/digital-land-python

Issue simili

Altre issue su Python

Ricevi le nuove issue nella tua casella

Un breve riepilogo di issue GitHub adatte ai principianti.