Kubo migration cannot stop an alpha.25 daemon that outlived Runtime (--enable-gc ignores API shutdown)

Ouverte
#505 0 commentaires 0 réactions 0 personnes assignées Voir sur GitHub

Les mainteneurs répondent en général sous 1 jour

Personne n'a encore pris cette issue.

Évaluation

Difficulté
4/5
Temps estimé
3-5 jours
Accessibilité débutants
42/100
Type d'issue
Bug
Clarté
Clairement spécifiée
Activité
Active
Stack technique
linux, rust

Piste de recherche

Start in retire_online_coord and trace how it verifies daemon ownership, sends /shutdown, and handles the five-second wait; the issue also points to update_controller/child.rs and scripts/mac-source-home-restart.sh. Run the real-Kubo test with its daemon started using --enable-gc to reproduce the failure. Done means the owned daemon is stopped after accepting shutdown, the test covers that case, and the source-Home restart stops the gateway process group.

Rédigé par le modèle d'indexation à partir du texte de l'issue.

Description

Found 29 Oct while testing the 0.8.0-alpha.26 candidate (8a74b669c).

What happens: Kubo started with --enable-gc (every alpha.25 and alpha.26 daemon) answers /api/v0/shutdown with 200 but does not exit until a second interrupt. The offline migration (retire_online_coord, capsules/ipfs-provider) relies on that API shutdown, so if an alpha.25 online daemon is still running when the new Runtime starts, the migration refuses every start and local IPFS stays unusable until a reboot or a manual kill; the old daemon keeps running online.

Why it does not affect normal installs: the installed stop and elastos update kill Runtime's whole process group (update_controller/child.rs), which includes Kubo, so the old daemon is gone before the new Runtime starts. CI update journeys pass. It shows only when a daemon survives outside that, e.g. after a crash or on source Homes (scripts/mac-source-home-restart.sh signals only the gateway pid).

Fix (0.8.1): in retire_online_coord, after a daemon proven to be ours (our PeerID from /id, holds our repo lock) accepted /shutdown and is still alive after 5 s, send it one SIGTERM (Kubo's own second-interrupt force stop); keep the refusal if it still runs. Make the real-Kubo test start its online daemon with --enable-gc so it fails before the fix. Also have the source-Home restart script stop the gateway's process group.

Langage dominant
Rust
Étoiles
6
Forks
2
Merge moyen
1 j 3 h
PR mergées (30 j)
42

Préparer son environnement

Ce projet ne fournit ni conteneur de développement, ni Dockerfile, ni guide de contribution : l'installation est à votre charge. Commencez par son README, et consultez notre guide de la première contribution pour les étapes générales.

Par où commencer

  1. Lisez l'issue en entier, puis le guide de contribution du projet.
  2. Signalez en commentaire que vous la prenez — cela évite que deux personnes fassent le même travail.
  3. Forkez le dépôt et travaillez sur une branche.
  4. Ouvrez une pull request qui référence le numéro de l'issue.

Autres issues de elastos/elastos-runtime

Toutes les issues de elastos/elastos-runtime

Issues similaires

Plus d'issues Rust

Recevez les nouvelles issues par e-mail

Un résumé court des issues GitHub adaptées aux débutants.