Kubo migration cannot stop an alpha.25 daemon that outlived Runtime (--enable-gc ignores API shutdown)

Abierto
#505 0 comentarios 0 reacciones 0 asignados Ver en GitHub

Los mantenedores suelen responder en 1 día

Nadie ha tomado este issue todavía.

Evaluación

Dificultad
4/5
Tiempo estimado
3-5 días
Aptitud para principiantes
42/100
Tipo de issue
Error
Claridad
Bien especificado
Estado de actividad
Activo
Stack tecnológico
linux, rust

Línea de trabajo

Start in retire_online_coord and trace how it verifies daemon ownership, sends /shutdown, and handles the five-second wait; the issue also points to update_controller/child.rs and scripts/mac-source-home-restart.sh. Run the real-Kubo test with its daemon started using --enable-gc to reproduce the failure. Done means the owned daemon is stopped after accepting shutdown, the test covers that case, and the source-Home restart stops the gateway process group.

Escrito por el modelo de indexación a partir del texto del issue.

Descripción

Found 29 Oct while testing the 0.8.0-alpha.26 candidate (8a74b669c).

What happens: Kubo started with --enable-gc (every alpha.25 and alpha.26 daemon) answers /api/v0/shutdown with 200 but does not exit until a second interrupt. The offline migration (retire_online_coord, capsules/ipfs-provider) relies on that API shutdown, so if an alpha.25 online daemon is still running when the new Runtime starts, the migration refuses every start and local IPFS stays unusable until a reboot or a manual kill; the old daemon keeps running online.

Why it does not affect normal installs: the installed stop and elastos update kill Runtime's whole process group (update_controller/child.rs), which includes Kubo, so the old daemon is gone before the new Runtime starts. CI update journeys pass. It shows only when a daemon survives outside that, e.g. after a crash or on source Homes (scripts/mac-source-home-restart.sh signals only the gateway pid).

Fix (0.8.1): in retire_online_coord, after a daemon proven to be ours (our PeerID from /id, holds our repo lock) accepted /shutdown and is still alive after 5 s, send it one SIGTERM (Kubo's own second-interrupt force stop); keep the refusal if it still runs. Make the real-Kubo test start its online daemon with --enable-gc so it fails before the fix. Also have the source-Home restart script stop the gateway's process group.

Lenguaje dominante
Rust
Estrellas
6
Forks
2
Merge medio
1 d 3 h
PR fusionados (30 d)
42

Preparar el entorno

Este proyecto no incluye contenedor de desarrollo, Dockerfile ni guía de contribución, así que la configuración corre por tu cuenta: empieza por su README y consulta nuestra guía para la primera contribución para los pasos generales.

Primeros pasos

  1. Lee el issue completo y luego la guía de contribución del proyecto.
  2. Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
  3. Haz un fork del repositorio y trabaja en una rama.
  4. Abre un pull request que haga referencia al número del issue.

Más de elastos/elastos-runtime

Todos los issues de elastos/elastos-runtime

Issues similares

Más issues de Rust

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.