Buildstream - Final Deployment and Training
Maintainers usually reply within 1 day
Nobody has claimed this yet.
Assessment
- Difficulty
- 4/5
- Estimated time
- Over a week
- Newbie friendliness
- 8/100
- Issue type
- Feature
- Clarity
- Needs clarification
- Activity status
- Active
- Domain
- devops
Research direction
The payload names no source files, tests or entry points; it is a delivery spec covering staging defect fixes, production installation, a final user manual and two training sessions. Start by checking whether prerequisite BR-30785 is finished and which staging defects are still open. Done means the acceptance criteria AC-001 to AC-003 are met: zero open P1/P2 defects, a health endpoint returning 200 with the release-tag version, and recorded training sessions.
Written by the indexing model from the issue text.
Description
Buildstream - Final Deployment and Training
Summary
This specification covers Final Software Deployment and User Training. The engineering team will resolve any minor software defects identified during final validation on the staging environment, deploy the final software on the production system, deliver the final user manual, and provide two virtual one-hour training sessions.
Problem Statement
The deployment requires the final production software to be defect-free in staging, fully deployed on the production system, and accompanied by formal documentation and training. Failure to complete these steps delays final delivery and delivery completion.
Value Proposition
Customer Value
- Operators receive the final software installed on the production system.
- Users receive the final user manual and two live training sessions to ensure successful adoption.
User Personas
- End User: Attends the virtual training sessions and utilizes the final user manual and production system software.
- Site Administrator: Validates the resolution of minor defects and oversees the production system deployment.
Use Cases
Use Case 1: Final Defect Resolution
Actor: Site Administrator
Context: Final validation is occurring on the staging environment.
Action: Minor defects are identified and resolved.
Result: The software is fully validated and ready for production system deployment.
Use Case 2: Production System Deployment & Handoff
Actor: Site Administrator & End User
Context: The software is ready for final deployment.
Action: The engineering team installs the software on the production system and provides the final manual.
Result: The production system is fully operational with the delivered software and documentation.
Use Case 3: User Training
Actor: End User
Context: The final software has been deployed.
Action: Users attend virtual training sessions provided by the engineering team.
Result: Users are trained and equipped to utilize the final software.
Scope Definition
Goals (Execution Outcomes)
- Goal 1: Resolve any minor software defects identified during final validation on the staging environment.
- Goal 2: Install the final software on the production system.
- Goal 3: Provide the final user manual to the operators.
- Goal 4: Conduct two virtual, one-hour training sessions.
Non-Goals (Scope Boundaries)
- Non-Goal 1: Development of new features not previously defined in the delivery plan.
- Non-Goal 2: Training beyond the explicitly mandated two, one-hour virtual sessions.
Requirements
Note: The following requirements are derived from the final delivery definitions.
Requirement: Staging Environment Defect Resolution [Req 1]
The system must be free of identified minor defects prior to production system deployment.
Scenario: Pre-deployment validation
- When minor software defects are identified, the engineering team resolves any minor software defects identified during final validation on the staging environment, prior to deployment on the production system.
Requirement: Production System Installation and Manual [Req 2]
The final software and documentation must be delivered to the production system.
Scenario: Final installation and handoff
- When completion of validation occurs, the engineering team installs the final software on the production system.
- The engineering team delivers the final user manual.
Requirement: User Training [Req 3]
The operators must receive training on the final software.
Scenario: Post-deployment training
- When training is requested, the engineering team provides two virtual, one-hour training sessions covering the final software.
Usability
- The provision of the final user manual and the two virtual training sessions are explicitly included to ensure high usability and adoption by the operators.
Reliability
- The engineering team must resolve minor software defects on the staging environment prior to main deployment to guarantee reliability on the production system.
Security
N/A - This feature introduces no new security boundaries beyond standard Omnia RBAC/TLS.
Performance
- The final software must operate defect-free on the production system as verified during the staging phase.
Documentation
- The engineering team must provide the final user manual to the operators.
Dependencies
- Prerequisite: BR-30785 (Buildstream Web Portal Production Stabilization).
- Infrastructure: Requires access to the production system for final installation.
Risks
| Risk | Category | Impact | Likelihood | Mitigation |
|---|---|---|---|---|
| Delivery Failure | Technical | High | Low | Strictly adhere to the exact delivery criteria for the final delivery. |
| Buildstream Dependencies | Technical | High | Medium | The buildstream is highly dependent on the image builder within OpenCHAMI, the GitLab interface and APIs, and the storage of images on S3 on PowerScale. Ensure these external dependencies are highly available and properly integrated. |
Acceptance Criteria
- AC-001: All defects logged against the staging environment during final validation are resolved and verified closed. The staging environment passes a full regression test suite with zero open P1/P2 defects before production deployment is approved. [Req 1]
- AC-002: The final software is installed on the production system, the application health endpoint returns HTTP 200, and the deployed version string matches the release tag. The final user manual (PDF, HTML, or hosted wiki) is delivered and accessible to operators - it covers all features delivered across prior deliveries (BR-81107 through BR-30785). [Req 2]
- AC-003: Two virtual training sessions of at least one hour each are conducted and recorded. Attendance records confirm that designated end users were invited. Session recordings and/or slide decks are delivered to the site as reusable training artifacts. [Req 3]
Assumptions / Open Questions
Assumptions
- A1: Required underlying hardware and OS capabilities are present.
Open Questions
- None.
- Dominant language
- Python
- Stars
- 9
- Forks
- 175
- Avg merge
- 1d 23h
- Merged PRs (30d)
- 137
Getting set up
- No Dockerfile or Docker Compose file
- Has a pull request template
- Read the contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from dell/omnia
-
`src/telemetry/containers/build_images.sh` should have localcopy build_actionPossibly taken @priti-parate claimed this 24 days ago. Openbug
Difficulty 2/5 1-3 hours Newbie friendliness 82/100
dell/omnia#5425 · 2 comments · 1 assignee ·
Maintainers usually reply within 1 day
-
Warning: SLURM_REPO_URL and SLURM_REPO_NAME must be provided.Possibly taken @priti-parate claimed this 24 days ago. Openbug
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
dell/omnia#5423 · 1 assignee ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 64/100
Maintainers usually reply within 1 day
-
use `hostnamectl` instead of `hostname`Possibly taken @richardhenwood-dell claimed this 81 days ago. Openenhancement
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
Maintainers usually reply within 1 day
-
Utility to create S3 format Image file from OCI format file hosted on a container image registryOpenenhancement
Difficulty 5/5 Over a week Newbie friendliness 35/100
Maintainers usually reply within 1 day
Similar issues
-
Difficulty 2/5 1-3 hours Newbie friendliness 82/100
Nixtla/mlforecast#823 ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 65/100
microsoft/ML-For-Beginners#1061 ·
-
bot-found documentation priority: P3
Difficulty 2/5 Under an hour Newbie friendliness 82/100
madenvel/KalinkaPlayer#503 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 63/100
EleutherAI/lm-evaluation-harness#4508 ·
Maintainers usually reply within 1 day