Add minimal mineral N cycle
Maintainers usually reply within 2 days
Nobody has claimed this yet.
Assessment
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Newbie friendliness
- 30/100
Research direction
The issue gives the target equation for dN_min/dt, taken from the model structure documentation (eq 15), and asks for only the fertilizer input, volatilization and leaching terms. Read that documentation section first to confirm how each flux term is defined. The payload names no source files, so locate the existing soil nitrogen or carbon pool updates in the C code yourself. Done means the N pool is updated, the docs and changelog are revised, and tests cover the new terms.
Written by the indexing model from the issue text.
Description
Starting with eq 15 specified in the model structure documentation:
$$
\frac{dN_\text{min}}{{dt}} =
F^N_\text{litter,min} +
F^N_\text{soil,min} +
F^N_\text{fix} +
F^N_\text{fert,min} -
F^N_\mathrm{vol} -
F^N_\text{leach} -
F^N_\text{uptake}
$$
The first step is to implement the core mineral N cycle, i.e.
$$
\frac{dN_\text{min}}{{dt}} =
F^N_\text{fert,min} -
F^N_\mathrm{vol} -
F^N_\text{leach}
$$
Each pull request should include
- updated documentation
- tests for new feature
- updated changelog
- Dominant language
- C
- Stars
- 42
- Forks
- 38
- Avg merge
- 3d 21h
- Merged PRs (30d)
- 10
Getting set up
- No Dockerfile or Docker Compose file
- Has a pull request template
- Read the contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from PecanProject/sipnet
-
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
PecanProject/sipnet#435 · 1 comment ·
Maintainers usually reply within 2 days
-
Make sure that documentation of sipnet.out header reflects implementationMay be free again @ANAMASGARD claimed this 152 days ago, and no pull request is open. Opendocumentation good first issue
Difficulty 2/5 1-3 hours Newbie friendliness 65/100
PecanProject/sipnet#345 · 8 comments · 1 reaction ·
Maintainers usually reply within 2 days
-
Remove unused `Tracker` fieldsMay be free again @ANAMASGARD claimed this 10 days ago, and no pull request is open. Opengood first issue on hold
Difficulty 4/5 3-5 days Newbie friendliness 45/100
PecanProject/sipnet#430 · 1 comment · 1 reaction ·
Maintainers usually reply within 2 days
-
Event checks ignore every events.in record after the firstPossibly taken @ANAMASGARD claimed this 10 days ago. Open
Difficulty 3/5 1-2 days Newbie friendliness 70/100
PecanProject/sipnet#429 · 3 comments · 1 assignee ·
Maintainers usually reply within 2 days
-
Events: revamp handling of "big delta" events to post-pool-updatePossibly taken @Alomir claimed this 13 days ago. Open
PecanProject/sipnet#423 · 1 assignee ·
Maintainers usually reply within 2 days
All issues in PecanProject/sipnet
Similar issues
-
good first issue help wanted program
Difficulty 2/5 1-3 hours Newbie friendliness 83/100
hffgzktbcc-blip/ounce-core#297 ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 65/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
coolsnowwolf/lede#14283 · 1 comment ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 65/100
OpenVisualCloud/SVT-JPEG-XS#130 ·
Maintainers usually reply within 1 day