OSUOSL scheduled upgrades (ppc64le) 22-24 September 2026
维护者通常 1 天内回复
还没有人认领这个 Issue。
评估
- 难度
- 1/5
- 预计耗时
- 1 小时以内
- 新手友好度
- 65/100
- Issue 类型
- 文档
- 描述清晰度
- 描述清楚
- 活跃度
- 活跃
调研方向
这是一份关于 OSUOSL ppc64le 基础设施计划维护的通知。该 issue 是信息性的;贡献者无需采取任何行动。要了解背景,请查阅 Node.js 构建基础设施文档或之前类似的 issue。工作只是确认该通知并确保团队知晓即将到来的停机时间。
由索引模型根据 Issue 内容生成。
描述
Received three separate emails from OSUOSL:
Scheduled Host Upgrade - Tue, September 22, 2026
We are writing to inform you of scheduled maintenance that will affect your virtual machine(s) on hypervisor node openpower11.osuosl.bak.
We are upgrading the operating system on this hardware. Because these virtual machines use storage local to the host, they cannot be moved elsewhere while the work is carried out. They will be shut down before the upgrade begins and started again once the host has been upgraded and verified.
Scheduled Date: Tue, September 22, 2026
Maintenance Window: 9am - 12:00PM PSTThe following virtual machines are affected:
...
Node.js:
- release-osuosl-rhel8-ppc64_le-2 (ACTIVE)
- test-osuosl-rhel8-ppc64_le-4 (ACTIVE)
- test-osuosl-rhel8-ppc64_le-5 (ACTIVE)
- test-osuosl-rhel9-ppc64_le-1 (ACTIVE)
- test-osuosl-rhel9-ppc64_le-2 (ACTIVE)
...
Scheduled Host Upgrade - Wed, September 23, 2026
We are writing to inform you of scheduled maintenance that will affect your virtual machine(s) on hypervisor node openpower13.osuosl.bak.
We are upgrading the operating system on this hardware. Because these virtual machines use storage local to the host, they cannot be moved elsewhere while the work is carried out. They will be shut down before the upgrade begins and started again once the host has been upgraded and verified.
Scheduled Date: Wed, September 23, 2026
Maintenance Window: 9:30AM - 1:30PM PSTThe following virtual machines are affected:
...
Node.js:
- test-osuosl-rhel10-ppc64_le-2 (ACTIVE)
...
Scheduled Host Upgrade - Thu, September 24, 2026
We are writing to inform you of scheduled maintenance that will affect your virtual machine(s) on hypervisor node openpower14.osuosl.bak.
We are upgrading the operating system on this hardware. Because these virtual machines use storage local to the host, they cannot be moved elsewhere while the work is carried out. They will be shut down before the upgrade begins and started again once the host has been upgraded and verified.
Scheduled Date: Thu, September 24, 2026
Maintenance Window: 2:00PM - 5:00PM PSTThe following virtual machines are affected:
...
Node.js:
- test-osuosl-rhel10-ppc64_le-1 (ACTIVE)
...
- 主要语言
- Jinja
- 星标
- 541
- 派生
- 185
- 平均合并
- 2 天 19 小时
- 30 天内合并 PR
- 6
环境准备
从这里开始
- 先读完整个 Issue,再读项目的贡献指南。
- 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
- Fork 仓库,在一个分支上完成修改。
- 提交 Pull Request,并在描述里引用这个 Issue 编号。
nodejs/build 的其他 Issue
-
难度 2/5 1-3 小时 新手友好度 70/100
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 72/100
维护者通常 1 天内回复
-
难度 5/5 一周以上 新手友好度 35/100
维护者通常 1 天内回复
-
incident
难度 4/5 3-5 天 新手友好度 42/100
维护者通常 1 天内回复
-
难度 4/5 3-5 天 新手友好度 45/100
维护者通常 1 天内回复
相似的 Issue
-
area/helm kind/bug priority/backlog triage/accepted
难度 2/5 1-3 小时 新手友好度 84/100
lexfrei/cloudflare-tunnel-gateway-controller#835 ·
维护者通常 1 天内回复
-
难度 1/5 1 小时以内 新手友好度 90/100
JPHutchins/code-review#262 ·
维护者通常 1 天内回复
-
难度 2/5 1-3 小时 新手友好度 86/100
E3SM-Project/e3sm_diags#1093 ·
-
kind/bug
难度 2/5 1-3 小时 新手友好度 72/100
维护者通常 7 天内回复
-
Area: Docker and Containers OS: Ubuntu
难度 2/5 1-3 小时 新手友好度 84/100
actions/runner-images#14790 · 1 条评论 ·
维护者通常 1 天内回复