Path for submissions that exceed the CI runner (6 h, 15 GiB): poincare_3d_topological and poincare_3d_smooth

未关闭
#663 0 条评论 0 个 reaction 已指派 0 人 在 GitHub 查看

维护者通常 1 天内回复

还没有人认领这个 Issue。

评估

难度
4/5
预计耗时
3-5 天
新手友好度
38/100
Issue 类型
功能
描述清晰度
描述清楚
活跃度
活跃
技术栈
github, github-actions, linux

调研方向

Start with the evaluate job and the workflow limits for ubuntu-latest, especially timeout-minutes: 360. Compare the submission and comparator resource requirements with available GitHub-hosted and self-hosted runner options. Done means maintainers choose and document a reproducible evaluation path that preserves the pinned checker and accommodates both runtime and memory needs.

由索引模型根据 Issue 内容生成。

描述

We have solutions to poincare_3d_topological and poincare_3d_smooth that pass the official comparator check locally. They cannot complete on the submission CI runner. Neither more time nor a smaller package would be enough on their own, because the check also needs more memory than the runner has. We would like to ask whether there is, or could be, a path for submissions like these.

This is related to #642 (memory limit), but here both time and memory are binding.

What happened in CI

  • Submissions: leanprover/lean-eval-submissions#2149 (poincare_3d_topological) and leanprover/lean-eval-submissions#2150 (poincare_3d_smooth).
  • Runs: https://github.com/leanprover/lean-eval-submissions/actions/runs/39094085392 and https://github.com/leanprover/lean-eval-submissions/actions/runs/39094086368.
  • In both runs the evaluate job ran from 2026-10-18 03:35 to 09:36 UTC. It was then cancelled by the job's timeout-minutes: 360.
  • At cancellation, lake's progress counter stood at [12995/13008] for topological and [14365/14403] for smooth. So the build of Submission was nearly finished.
  • The bot comment says the harness "reported an error rather than a result" and points to the workspace layout. As far as we can tell, the cause is the job timeout, not the layout.

Why finishing the build would not be enough

We ran the official check locally with comparator d03acab, lean4export 076e8e5 and nanoda 68d5ca9, plus Lean kernel replay. The permitted axioms were propext, Quot.sound and Classical.choice. It ran in an isolated container.

poincare_3d_topological poincare_3d_smooth
result "Your solution is okay!" "Your solution is okay!"
wall time at 48 CPUs 4 h 11 min (46.7 CPU-hours) about 4 h 15 min (42.2 CPU-hours)
export of the theorem's dependency cone 8.15 GB 7.04 GB
comparator peak memory 27.9 GB 25.3 GB
kernel replay phase alone about 17.8 GB 16.1 GB average, 17.3 GB peak

The evaluate job runs on ubuntu-latest. The workflow's own comment gives that as 4 cores, 15 GiB and 3 GiB swap. So comparator would be killed after the build even with no time limit. Comparator's peak is about 3.5–3.6× the export size. The export contains exactly the theorem's dependency cone, so removing unused code or vendored packages does not shrink it. To fit in 16 GB, the proof terms would need to be about 43–52 % smaller with every statement unchanged. We do not see a way to do that.

As far as we can see, earlier submissions of these two problems ended the same way: leanprover/lean-eval-submissions#1961, leanprover/lean-eval-submissions#1962, leanprover/lean-eval-submissions#1973, leanprover/lean-eval-submissions#1974, leanprover/lean-eval-submissions#2113 and leanprover/lean-eval-submissions#2119.

Request

Would the maintainers consider one of these for submissions that pass the official check but exceed the CI runner?

As the workflow notes, 360 minutes is GitHub's per-job ceiling for hosted runners, and ubuntu-latest-large has the same 4 cores and 15 GiB on this org. So the fix probably has to come from outside hosted runners:

  1. A self-hosted or larger runner lane for submissions that need it, for example 16 or more cores and 64 GB.
  2. A maintainer-run evaluation on a bigger machine, with the same pinned comparator, lean4export, nanoda and Lean versions.

We are happy to provide full logs and measurements. We can also re-run any check you specify, or adjust the packaging if a particular layout helps.

Credit

The proofs come from a Lean library of differential geometry built by members of our team. It formalizes Perelman's proof (Ricci flow with surgery, finite extinction). Its authors are Yuan Liao, Ziyang Qin, Jui-Hui Chung, Ayush Khaitan, Zhengyang Zhang, Hongzhou Lin, Zijian Zhang, Ligeng Zhu, Peng Lu and Bennett Chow. The bridge to the Lean-Eval statements, the packaging of the import closure and the checks above were also done within the team.

主要语言
Lean
星标
52
派生
46
平均合并
1 天 1 小时
30 天内合并 PR
16

环境准备

这个项目没有提供开发容器、Dockerfile 或贡献指南,环境需要你自己搭建:先看它的 README,通用步骤见我们的新手贡献指南。

从这里开始

  1. 先读完整个 Issue,再读项目的贡献指南。
  2. 在 Issue 下留言说明你要接手 —— 这能避免两个人做同样的事。
  3. Fork 仓库,在一个分支上完成修改。
  4. 提交 Pull Request,并在描述里引用这个 Issue 编号。

leanprover/lean-eval 的其他 Issue

查看 leanprover/lean-eval 的全部 Issue

相似的 Issue

更多 DevOps Issue

把新 issue 发到你的邮箱

精选适合新手参与的 GitHub issue 摘要。