Merge queue evicts entries on CLI_CONTRACT.md conflicts (3 PRs, 4 evictions on 11-07)

未關閉
#2,036 2 則留言 0 個 reaction 已指派 0 人 在 GitHub 檢視

維護者通常 1 天內回覆

還沒有人認領這個 Issue。

評估

難度
5/5
預估耗時
一週以上
新手友好度
35/100
Issue 類型
重構
描述清晰度
基本清楚
活躍度
活躍
技術堆疊
rust
領域
cli, documentation

研究方向

Start with crates/socket-patch-cli/CLI_CONTRACT.md and inspect how the VEX code table and long reason lists are organized; the issue lists three possible structural changes but says an owner decision is needed. Check the contract_* tests in json_envelope.rs to understand which contract sections they read. Done means an agreed change reduces merge conflicts while keeping those tests and the documented contract correct.

由索引模型根據 Issue 內容生成。

描述

agent:needs-human agent:triaged ci-janitor priority:p3

Problem

Every merge-queue removal in the last 24h that wasn't a merge was a merge conflict. The conflicts are mostly in crates/socket-patch-cli/CLI_CONTRACT.md. When a batch lands, the entries queued behind it start conflicting with main. The queue drops them, and they sit out until the burn-down merges main and the final reviewer re-adds them, about an hour later.

Evidence from 2026-11-07 (UTC):

PR enqueued removed (not merged) conflict commit merged
#2006 01:50:39 01:55:41 (merge of main) 02:54:57
#2007 01:50:37 01:55:41 02:30 Conflicts: CLI_CONTRACT.md, crates/... 02:54:57
#2008 01:50:35 01:55:40, then again 02:54:57 (after #2006/#2007 landed) 02:27 and 03:20 Conflicts: CLI_CONTRACT.md ... 03:53:11

No merge_group run was ever created for these entries; they were removed when the 5 entries ahead (#2030, #2022, #2014, #2004, #2001) merged. CI was not the cause: all 35 merge_group runs in the window succeeded.

Hotspot: CLI_CONTRACT.md was touched by 17 of the 50 commits on main since 2026-10-31. The next most-touched file had 9. The common edits are:

  • new rows appended to the ### VEX code table, always just above the last row (vex_gradle_derived_cache_unchecked), so any two PRs that each add a code conflict;
  • the long single-line reason lists, e.g. "Recognition rules that hold for every ecosystem" (~line 550) and the sbt/scala-cli liveness paragraph at the end of the file.

Possible fixes (need an owner decision; not CI config)

  1. Keep table rows in alphabetical order rather than "insert before the last row", so unrelated codes land on different lines.
  2. Wrap reason lists one item per line, so two additions don't rewrite the same physical line.
  3. Split the VEX / vendored code tables out of CLI_CONTRACT.md into per-ecosystem files. The contract_* tests in json_envelope.rs only read the envelope/action blocks.

The ci-janitor routine is leaving this alone because it's a docs-structure change that every in-flight PR would have to rebase onto.

🤖 Generated with Claude Code


Generated by Claude Code

主要語言
Rust
星號
9
分支
2
平均合併
1 天 8 小時
30 天內合併 PR
309

環境準備

  • 沒有 Dockerfile 或 Docker Compose 檔案
  • 沒有 Pull Request 範本
  • 閱讀貢獻指南

從這裡開始

  1. 先讀完整個 Issue,再讀專案的貢獻指南。
  2. 在 Issue 下留言說明你要接手 —— 這能避免兩個人做同樣的事。
  3. Fork 儲存庫,在一個分支上完成修改。
  4. 送出 Pull Request,並在描述裡引用這個 Issue 編號。

SocketDev/socket-patch 的其他 Issue

查看 SocketDev/socket-patch 的全部 Issue

相似的 Issue

更多 Rust Issue

把新 issue 寄到你的電子郵件信箱

精選適合新手參與的 GitHub issue 摘要。