Projects: load the Storage panel only when it is opened
Maintainers usually reply within 1 day
Nobody has claimed this yet.
Assessment
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Newbie friendliness
- 84/100
- Issue type
- Feature
- Clarity
- Clearly specified
- Activity status
- Active
- Tech stack
- next.js, typescript
- Domain
- frontend, performance
Research direction
Start with components/projects/storage-panel.tsx, then inspect where project-manager.tsx renders it and how components/ui/panel.tsx handles folded state. Read the storage end-to-end tests and check the current /projects budget in bundle-budget.json; use pnpm bundle:size to measure the change. Done when the panel body loads on first open, existing tests and the axe scan pass, and /projects is at least 10 kB smaller gzipped.
Written by the indexing model from the issue text.
Description
Summary
The Brand Projects route is the heaviest after the studios (about 313 kB gzipped) and the Storage panel, with its report code, offline keeping and trimming, ships with it although it starts folded. Load it on first open.
Part of the 2.0.0 plan: fewer, better and fully tested studios, on a calmer and faster site.
Where to look
components/projects/storage-panel.tsxand whereproject-manager.tsxrenders itcomponents/ui/panel.tsxbundle-budget.jsonandpnpm bundle:size
Behaviour
- Split the panel's body out and load it with
next/dynamicwhen the panel is first opened, with a short placeholder. - Keep the folded state, the section state and every existing test working.
- Lower the
/projectsbudget to the new size.
Acceptance criteria
-
/projectsis at least 10 kB smaller gzipped. - The storage end-to-end tests pass unchanged.
- The axe scan passes with the panel open.
Getting started: fork the repo, then pnpm install and pnpm dev (Node 22+, pnpm 11, no API keys). Before opening a PR, run pnpm typecheck && pnpm test && pnpm lint && pnpm format:check && pnpm check:dashes && pnpm build (CI fails on unformatted files, so pnpm format first). See CONTRIBUTING.md and the first contribution walkthrough.
Everything needed is in the repository. This doesn't need maintainer access, secrets or paid services. Comment below to claim it, and ask questions here any time.
- Dominant language
- TypeScript
- Stars
- 11
- Forks
- 3
- Avg merge
- 5h 44m
- Merged PRs (30d)
- 72
Getting set up
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from yakew7/DesignHub
-
area: docs difficulty: medium enhancement help wanted testing v2.0.0
Difficulty 2/5 1-3 hours Newbie friendliness 85/100
Maintainers usually reply within 1 day
-
accessibility area: ui difficulty: medium enhancement help wanted v2.0.0
Difficulty 4/5 3-5 days Newbie friendliness 57/100
Maintainers usually reply within 1 day
-
area: projects difficulty: easy enhancement good first issue help wanted v2.0.0
Difficulty 3/5 1-2 days Newbie friendliness 76/100
Maintainers usually reply within 1 day
-
area: backgrounds difficulty: easy enhancement good first issue help wanted testing v2.0.0
Difficulty 3/5 1-2 days Newbie friendliness 82/100
Maintainers usually reply within 1 day
-
area: social difficulty: medium enhancement help wanted v2.0.0
Difficulty 3/5 1-2 days Newbie friendliness 62/100
yakew7/DesignHub#499 · 1 comment ·
Maintainers usually reply within 1 day
All issues in yakew7/DesignHub
Similar issues
-
desktop v3 windows
Difficulty 2/5 1-3 hours Newbie friendliness 75/100
esengine/DeepSeek-Reasonix#15016 · 1 comment ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
readest/readest#7413 · 1 comment ·
Maintainers usually reply within 1 day
-
enhancement good first issue priority: medium size: XS
Difficulty 2/5 1-3 hours Newbie friendliness 85/100
Maintainers usually reply within 1 day
-
content triage
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 75/100
eliasstravik/herdr-projects#788 ·