Run scenarios in parallel workers on Windows

Đang mở
#427 0 bình luận 0 reaction 0 người được giao Xem trên GitHub

Maintainer thường phản hồi trong vòng 1 ngày

Chưa có ai nhận issue này.

Đánh giá

Độ khó
4/5
Thời gian dự kiến
3-5 ngày
Mức phù hợp với người mới
25/100
Loại issue
Tính năng
Độ rõ ràng
Khá rõ ràng
Mức độ hoạt động
Sôi nổi
Công nghệ
bash, php, sqlite
Lĩnh vực
ci-cd, testing

Hướng nghiên cứu

Start with the Windows branch in bin/run-behat-tests, which sets PARALLEL to empty, and with the worker startup, output and exit-code handling in utils/behat-parallel.php. Check how temporary directories and TMPDIR/TEMP are used under Git Bash. Done means the Windows job runs with WP_CLI_TEST_PARALLEL=4 on a draft branch, with results matching the serial run and Behat time reduced. This needs Windows CI access and familiarity with the project's process handling.

Do mô hình lập chỉ mục viết ra từ nội dung của issue.

Mô tả

os:windows scope:testing status:unconfirmed

Part of #394. Follow-up to #390.

bin/run-behat-tests turns parallel workers off on Windows (MINGW*|MSYS*|CYGWIN*) PARALLEL="";;), and the Docker mode is unavailable there as well, so the Windows Behat job runs every scenario one after the other. Since the Linux jobs run in 4 parallel workers, the Windows job is now the longest job of most large suites. In the full-matrix runs of 2026-11-02:

Package Longest Linux job macOS job (4 workers) Windows job (serial)
entity-command 9.8 min 23.2 min 53.0 min
extension-command 8.4 min 12.9 min 28.7 min
core-command 5.3 min 4.7 min 11.4 min
media-command 4.9 min 6.9 min 11.0 min
scaffold-command 5.4 min 3.4 min 9.1 min
language-command 4.4 min 3.4 min 8.8 min

The Windows job is continue-on-error, so it does not block a pull request. It still sets how long the Testing workflow takes to finish, though. In entity-command, the job took 53 minutes for 498 scenarios. The macOS job already runs in parallel workers on the runner and went from about 26 to 23 minutes.

The Windows job uses SQLite, so the worker databases are not an obstacle. #405 does not say why Windows was left out. Things to check before turning it on:

  • process handling in utils/behat-parallel.php (starting the workers, collecting their output and exit codes, and signals, see #418) with Git Bash and the Windows PHP build;
  • per-worker temporary directories and TMPDIR, as Windows uses TEMP/TMP, and the runner moves temporary files to the D: drive;
  • run directories are still removed right away on Windows (#403), which may make workers slower than expected;
  • scenarios that use fixed ports or background processes, which already run in the first worker.

Measuring: run the Windows job of entity-command and extension-command with WP_CLI_TEST_PARALLEL=4 on a draft branch, and compare Behat time and results with the serial runs of 2026-11-02. Check the first parallel pass, not only the result after composer behat-rerun.

Ngôn ngữ chính
PHP
Star
42
Fork
29
Merge trung bình
18 giờ 52 phút
Pull request đã merge (30 ngày)
27

Chuẩn bị môi trường

Bắt đầu từ đâu

  1. Đọc hết issue, rồi đọc hướng dẫn đóng góp của dự án.
  2. Bình luận trên issue rằng bạn sẽ nhận — tránh hai người làm cùng một việc.
  3. Fork repository và làm thay đổi trên một nhánh.
  4. Mở pull request có tham chiếu số hiệu của issue.

Issue khác của wp-cli/wp-cli-tests

Tất cả issue của wp-cli/wp-cli-tests

Issue tương tự

Thêm issue về PHP

Nhận issue mới trong hộp thư của bạn

Bản tóm tắt ngắn những issue GitHub phù hợp với người mới.