Upgrades page, cluster upgrade history, and stage and organization links in Studio
Maintainer thường phản hồi trong vòng 1 ngày
Chưa có ai nhận issue này.
Đánh giá
- Độ khó
- 5/5
- Thời gian dự kiến
- Hơn một tuần
- Mức phù hợp với người mới
- 35/100
- Loại issue
- Tính năng
- Độ rõ ràng
- Đặc tả rõ ràng
- Mức độ hoạt động
- Sôi nổi
- Công nghệ
- playwright, react, typescript
- Lĩnh vực
- frontend
Hướng nghiên cứu
Start with the screen design in #2091 and the organization and cluster menu entry points for the Upgrades page, history, and link controls. The work depends on Central Manager routes #1178, #1179, and #1191, upgrade path issues #1187–#1190, and upgrade decision sign-off; review those before estimating implementation. Done means the listed admin controls, read-only member view, hidden-on-404 behavior, co-located Vitest tests, and Playwright coverage meet the acceptance criteria.
Do mô hình lập chỉ mục viết ra từ nội dung của issue.
Mô tả
Start: Waits for sign-off of the upgrade decisions, and for HarperFast/central-manager#1178, HarperFast/central-manager#1179, HarperFast/central-manager#1187, HarperFast/central-manager#1188, HarperFast/central-manager#1189, HarperFast/central-manager#1190 and HarperFast/central-manager#1191 in Central Manager.
Delivery: in one PR with #2091 and #2092.
What and why
Fabric clusters will be upgraded automatically each month on a slot Harper assigns to the organization (HarperFast/central-manager#1177). Customers need to see and steer that in Studio: when the next upgrade is, which build, which cluster goes first, and what happened before. This issue adds the Upgrades page, the per-cluster upgrade history, and the controls for stage links and organization links.
Scope
- Upgrades page, in the organization menu. Shows the slot, the next cycle's dates and pinned build, and each cluster's state. Org admins can move a date earlier for this cycle, and, in an organization on the conservative track, turn the hold on or off.
GET /UpgradeSchedule,GETandPATCH /UpgradeCycle(HarperFast/central-manager#1191). - Upgrade history, in the cluster menu next to Version: versions, dates, source and outcome.
GET /Cluster/:id/upgrades(HarperFast/central-manager#1191). - Stage link, in cluster settings: pick the production cluster this cluster upgrades before, or clear it. Clusters in linked organizations are offered.
PUT /Cluster/:idwithupgradeBeforeClusterId(HarperFast/central-manager#1179). - Organization link: link or unlink another organization the user also administers.
POST /OrganizationLink,DELETE /OrganizationLink/:id(HarperFast/central-manager#1178). - Members who are not admins see the page read-only.
- Everything stays hidden while the routes answer 404 or the mode is off.
- Follow the screen design in #2091.
Out of scope
- Notices and notification settings: #2092.
- Staff pages: #2094.
Depends on decisions
The scope may change with sign-off of the upgrade decisions. If one of these changes, revisit this issue.
- A customer can move a date for one cycle, earlier only, never later than the slot (D13).
- Stage and production are at least one business day apart, and a date can be moved until the day before (P1).
- The conservative-track hold is turned on or off by the org admin and locks when the stage upgrade starts (D49).
- Org admins and staff can set the stage link (D7).
- One stage cluster per production cluster at launch (D6).
- A stage cluster may be in a linked organization (D8).
- The upgrade history page is in launch scope (D43).
- Everything ships off and is turned on by configuration (D38).
Depends on
- HarperFast/central-manager#1178, HarperFast/central-manager#1179, HarperFast/central-manager#1191: the routes these screens call.
- HarperFast/central-manager#1187 to HarperFast/central-manager#1190: the live upgrade path behind them.
- #2091: the design document.
Acceptance
- An org admin can move a date earlier and toggle the hold; the server's refusals (a later date, a locked hold) are shown plainly.
- History lists each upgrade of the cluster.
- A stage link can be set and cleared, including to a cluster in a linked organization.
- Nothing new shows when the routes answer 404.
- Vitest tests co-located with the components, and Playwright coverage for the Upgrades page.
Part of HarperFast/central-manager#1177.
🤖 Generated by Claude Code (Claude Opus 5.5); posted via @Devin-Holland.
- Ngôn ngữ chính
- TypeScript
- Star
- 5
- Fork
- 4
- Merge trung bình
- 2 ngày 13 giờ
- Pull request đã merge (30 ngày)
- 60
Chuẩn bị môi trường
- Không có Dockerfile hay tệp Docker Compose
- Không có mẫu pull request
- Đọc hướng dẫn đóng góp
Bắt đầu từ đâu
- Đọc hết issue, rồi đọc hướng dẫn đóng góp của dự án.
- Bình luận trên issue rằng bạn sẽ nhận — tránh hai người làm cùng một việc.
- Fork repository và làm thay đổi trên một nhánh.
- Mở pull request có tham chiếu số hiệu của issue.
Issue khác của HarperFast/studio
-
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 70/100
HarperFast/studio#2111 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 82/100
HarperFast/studio#2109 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
rum
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 72/100
HarperFast/studio#2085 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 78/100
HarperFast/studio#2070 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 74/100
HarperFast/studio#2067 ·
Maintainer thường phản hồi trong vòng 1 ngày
Tất cả issue của HarperFast/studio
Issue tương tự
-
Độ khó 1/5 1-3 giờ Mức phù hợp với người mới 83/100
gofish-graphics/gofish-graphics#1384 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
adapter bug
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 83/100
Olanetsoft/agent-lookout#353 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 68/100
vicharanashala/vibe#1542 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
bug chore P2 size:XS
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 77/100
josephfung/curia#2666 ·
Maintainer thường phản hồi trong vòng 1 ngày
-
bug good first issue
Độ khó 2/5 1-3 giờ Mức phù hợp với người mới 84/100
devarshishimpi/codra#178 ·
Maintainer thường phản hồi trong vòng 1 ngày