(file): Maximum call stack size exceeded.
Nobody has claimed this yet.
Assessment
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Newbie friendliness
- 25/100
Research direction
Reproduce the failure in the first example on Safari on macOS by entering 1+1 and pressing Run repeatedly, both quickly and slowly. Investigate from the example runner entry point; done means repeated runs no longer produce “Maximum call stack size exceeded” or require reloading the page.
Written by the indexing model from the issue text.
Description
I frequently get (file): Maximum call stack size exceeded. All examples.
The first try on examples seem to work. But soon I get the (file): Maximum call stack size exceeded.
When I reload the page it works again for a while.
I use Safari on MacBook. No extentions activated.
Is this just me, or a bug.
UPDATE:
go to first example and input 1+1. Press Run about 10 times or more
If I do it very slow, it will fail after 5 times.
- Dominant language
- Ruby
- Stars
- 258
- Forks
- 113
- PR merge metrics
- No merged PRs in 30d
Getting set up
- Ships a Dockerfile or Docker Compose file
- No pull request template
- No contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from ruby/TryRuby
-
Difficulty 3/5 1-2 days Newbie friendliness 64/100
-
docs: clarify default parameter behavior in section Quickening it Up and fix Portuguese translation typoPossibly taken @MatheoPaiva claimed this 2 days ago. Open
Difficulty 1/5 Under an hour Newbie friendliness 40/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 48/100
-
Difficulty 4/5 3-5 days Newbie friendliness 48/100
-
Difficulty 4/5 3-5 days Newbie friendliness 25/100
Similar issues
-
🐛 bug 👩💻 équipe CE 🧑🏭 entreprises
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
betagouv/conseillers-entreprises#4808 ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
yosiat/panko_serializer#250 ·
-
Difficulty 1/5 Under an hour Newbie friendliness 75/100
cline/mcp-marketplace#3886 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 78/100