Unbounded "idea to production in minutes" claim on /product/internal-developer-platforms/
Nobody has claimed this yet.
Assessment
- Difficulty
- 1/5
- Estimated time
- Under an hour
- Newbie friendliness
- 92/100
- Issue type
- Documentation
- Clarity
- Clearly specified
- Activity status
- Active
- Domain
- content, documentation
Research direction
Open content/product/internal-developer-platforms.md at line 30 and inspect the feature_split section's first Ship faster card alongside the neighboring cards. Replace the unbounded end-to-end time claim with a concrete capability statement matching the page's tone and length, then verify the rendered product page shows the revised copy.
Written by the indexing model from the issue text.
Description
Where
content/product/internal-developer-platforms.md, line 30 (the feature_split section's first card, Ship faster), live at https://www.pulumi.com/product/internal-developer-platforms/
What's live today
Golden paths and reusable components get engineers from idea to production in minutes.
Why this needs a fix
"Idea to production" has no fixed scope: it spans requirements, design, review, and rollout, none of which is bounded by "minutes." This is the same defect class fixed on /contact/ in #21417/#21418: an open-ended, unverifiable end-to-end time claim, distinct from a bounded first-step claim like "deploy your first project in minutes."
Did a substantiated stat exist?
Checked our published case studies for a number that could replace the claim honestly (CLEAR: ~90% smaller infrastructure codebase; Wiz: 5x faster customer onboarding; Spear AI: 6x faster time to ATO). Each of those numbers is customer-specific and needs attribution to be honest, and this three-card grid has no room for attribution alongside the other two plain capability cards. Proposing a separate, attributed proof-point section as a follow-up rather than smuggling a customer stat into this card.
Proposed fix
Golden paths and reusable components let engineers ship approved infrastructure without waiting on the platform team.
Drops the unbounded time claim, keeps a concrete capability statement consistent with the rest of the page (Components, Self-Service, Policies sections), and matches the sibling cards' length and tone.
- Dominant language
- HTML
- Stars
- 178
- Forks
- 271
- Avg merge
- 1d 1h
- Merged PRs (30d)
- 546
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from pulumi/docs
-
area/docs-content Bug pulumi/docs
Difficulty 1/5 1-3 hours Newbie friendliness 94/100
-
area/www-content Bug
Difficulty 1/5 Under an hour Newbie friendliness 92/100
-
area/www-content Bug
Difficulty 1/5 Under an hour Newbie friendliness 94/100
-
area/docs-content Bug kind/bug pulumi/docs
Difficulty 1/5 1-3 hours Newbie friendliness 88/100
-
area/automation area/infrastructure awaiting-upstream
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
Similar issues
-
community first-timers-only good first issue hacktoberfest help wanted low hanging fruit up-for-grabs
Difficulty 1/5 Under an hour Newbie friendliness 95/100
-
Ecosystem: ClawMetry — the Qwen Code reader is now free and open source (follow-up to #9294 / #9338) Opencategory/integration priority/P3 scope/documentation status/ready-for-human type/feature-request
Difficulty 1/5 Under an hour Newbie friendliness 84/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
TheOdinProject/curriculum#31408 ·
-
archived coursework help wanted scope: curriculum
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
freeCodeCamp/freeCodeCamp#70260 · 1 comment ·
-
雪鸿集 Open待处理 申请收录
Difficulty 1/5 Under an hour Newbie friendliness 72/100
travellings-link/travellings#4000 · 1 comment ·