[V1-2] Produção paralela e virada do deploy
Maintainers usually reply within 1 day
Nobody has claimed this yet.
Assessment
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Newbie friendliness
- 35/100
- Issue type
- Feature
- Clarity
- Mostly clear
- Activity status
- Active
- Tech stack
- javascript, node.js
Research direction
Read ZAPFORGE_PLAN.md §9 and the migration decision D23, then review the apps/lumabot package and the work in blocking issue #153. The issue gives no specific deployment files or tests to start from, so first establish how production deployment and parallel operation are currently handled. Done means the parallel-production period finishes without regressions and production deploys point to apps/lumabot, with the stated DoD checks satisfied.
Written by the indexing model from the issue text.
Description
Bridger · #V1-2 · Milestone v1.0 Virada · Pacote
apps/lumabot
Objetivo
Período de produção paralela e virada do deploy para apps/lumabot.
Critérios de aceite
- Período de produção paralela concluído sem regressão
- Deploy de produção apontando para
apps/lumabot
DoD geral
Testes verdes; nenhum teste existente apagado/reescrito sem autorização; docs (COMO) atualizadas; ADR quando houver decisão arquitetural; changeset criado; Biome sem erros; benchmark sem regressão > 10% (a partir do M2).
Decisões relacionadas
- D23: Migração incremental (legacy/)
- Tabela completa: BRIDGER_PLAN.md §4
Dependências
Bloqueada por: #153 (V1-1). Registrado também como blocked by nativo.
Referência
- Dominant language
- JavaScript
- Stars
- 26
- Forks
- 6
- Avg merge
- 43m
- Merged PRs (30d)
- 137
Getting set up
- Ships a Dockerfile or Docker Compose file
- No pull request template
- No contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from murillous/LumaBot
-
area:plugin type:bug
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day
-
area:plugin good first issue type:bug
Difficulty 1/5 1-3 hours Newbie friendliness 85/100
Maintainers usually reply within 1 day
-
area:plugin good first issue type:debt
Difficulty 3/5 1-2 days Newbie friendliness 78/100
Maintainers usually reply within 1 day
-
area:plugin type:bug
Difficulty 3/5 1-2 days Newbie friendliness 54/100
Maintainers usually reply within 1 day
-
area:plugin type:feature
Difficulty 4/5 1-2 days Newbie friendliness 52/100
Maintainers usually reply within 1 day
All issues in murillous/LumaBot
Similar issues
-
Difficulty 2/5 1-3 hours Newbie friendliness 77/100
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
bluerobotics/Cockpit-docs#48 ·
-
documentation
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
PhyberApex/slds-json-schema-renderer#372 ·
Maintainers usually reply within 1 day
-
usage: a custom provider's balance meters ("…%" in the balance path) ignore the Left/Used switchOpen
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
Maintainers usually reply within 1 day
-
[BUG] rag: sentence content can cross the reported sentence boundariesPossibly taken @LJK-ikun claimed this today. Openbug
Difficulty 2/5 1-3 hours Newbie friendliness 75/100
Maintainers usually reply within 1 day