Annotation for Date axis
Maintainers usually reply within 4 days
Nobody has claimed this yet.
Assessment
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Newbie friendliness
- 28/100
- Issue type
- Feature
- Clarity
- Needs clarification
- Activity status
- Stale
- Tech stack
- java
- Domain
- data-visualization
Research direction
Start by tracing XYChart.addSeries() and the Annotation* constructors, then inspect how Date values are converted for the Date axis. Reproduce the reported mismatch with a Date-based chart and determine how annotation positions are calculated. Done means annotations align with the corresponding dates and the behavior is covered by a test or example.
Written by the indexing model from the issue text.
Description
XYChart.addSeries() accepts a list of java.util.Date, but Annotation* constructor only accepts a double. I tried to convert Date to millis, but annotation is always rendered before the actual date. There's nothing similar in tests or examples, so could someone please tell me what is the proper way to calc annotation position for the Date axis type?
- Dominant language
- Java
- Stars
- 1.6k
- Forks
- 400
- Avg merge
- 3d 9h
- Merged PRs (30d)
- 7
Getting set up
This project ships no dev container, Dockerfile or contributing guide, so setting up is up to you: start from its README, and see our first-contribution guide for the general steps.
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from knowm/XChart
-
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
Maintainers usually reply within 4 days
-
Difficulty 3/5 1-2 days Newbie friendliness 57/100
Maintainers usually reply within 4 days
-
Difficulty 3/5 1-2 days Newbie friendliness 67/100
Maintainers usually reply within 4 days
-
Cleanup: generate axis ticks in-range instead of pruning after the fact (follow-up to #634)Possibly taken @Sinkleberg claimed this 20 days ago. Open
Difficulty 4/5 3-5 days Newbie friendliness 48/100
Maintainers usually reply within 4 days
-
`CategoryChart.addSeries` could support additional call signature for interoperability with ScalaPossibly taken @Sinkleberg claimed this 20 days ago. Open
Difficulty 3/5 1-2 days Newbie friendliness 45/100
Maintainers usually reply within 4 days
Similar issues
-
documentation good first issue help wanted
Difficulty 1/5 Under an hour Newbie friendliness 90/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
Maintainers usually reply within 2 days
-
bug key bindings
Difficulty 2/5 1-3 hours Newbie friendliness 79/100
Maintainers usually reply within 1 day
-
Android Bug Core Drape
Difficulty 2/5 1-3 hours Newbie friendliness 77/100
organicmaps/organicmaps#14449 ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 82/100
openhab/openhab-addons#22512 ·
Maintainers usually reply within 1 day