Improvement Idea : multiple plots sharing same axis
Maintainers usually reply within 4 days
Nobody has claimed this yet.
Assessment
- Difficulty
- 5/5
- Estimated time
- Over a week
- Newbie friendliness
- 30/100
- Issue type
- Feature
- Clarity
- Mostly clear
- Activity status
- Quiet
- Tech stack
- java
- Domain
- data-visualization
Research direction
Review XChart's existing plot layout, axis, and zoom behavior first. Determine how vertically, horizontally, and grid-arranged plots could share numerical or categorical axes and synchronize zooming. Done means linked plots remain aligned when the shared axis is zoomed, with the non-shared axes still usable.
Written by the indexing model from the issue text.
Description
Hi, I don't know if it is possible now, but it is sometimes very usefull to create multiple plots (vertically or horizontally, or in grid like for corrplot() function in Matlab), sharing the same axis.
The axis are linked : if you zoom on one plot, the other zoom as well (on the linked axis)
The linked axis should be numerical or categorical.
I think one way of doing this, is to put, for example, 2 plots in a grid layout, hide one axis, and synchronize the zoom in both plots.
- Dominant language
- Java
- Stars
- 1.6k
- Forks
- 400
- Avg merge
- 3d 9h
- Merged PRs (30d)
- 7
Getting set up
This project ships no dev container, Dockerfile or contributing guide, so setting up is up to you: start from its README, and see our first-contribution guide for the general steps.
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from knowm/XChart
-
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
Maintainers usually reply within 4 days
-
Difficulty 3/5 1-2 days Newbie friendliness 57/100
Maintainers usually reply within 4 days
-
Difficulty 3/5 1-2 days Newbie friendliness 67/100
Maintainers usually reply within 4 days
-
Cleanup: generate axis ticks in-range instead of pruning after the fact (follow-up to #634)Possibly taken @Sinkleberg claimed this 20 days ago. Open
Difficulty 4/5 3-5 days Newbie friendliness 48/100
Maintainers usually reply within 4 days
-
`CategoryChart.addSeries` could support additional call signature for interoperability with ScalaPossibly taken @Sinkleberg claimed this 20 days ago. Open
Difficulty 3/5 1-2 days Newbie friendliness 45/100
Maintainers usually reply within 4 days
Similar issues
-
documentation good first issue help wanted
Difficulty 1/5 Under an hour Newbie friendliness 90/100
-
bug
Difficulty 2/5 1-3 hours Newbie friendliness 75/100
eclipse-sw360/sw360#4849 ·
Maintainers usually reply within 2 days
-
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
Maintainers usually reply within 2 days
-
bug key bindings
Difficulty 2/5 1-3 hours Newbie friendliness 79/100
Maintainers usually reply within 1 day
-
Android Bug Core Drape
Difficulty 2/5 1-3 hours Newbie friendliness 77/100
organicmaps/organicmaps#14449 ·
Maintainers usually reply within 1 day