[Task][RFC]: Complete automatic execution admission and cross-surface readback
メンテナーはふだん 1 日以内に返信
まだ誰も着手していません。
評価
- 難易度
- 5/5
- 見積もり時間
- 1週間以上
- 初心者へのやさしさ
- 25/100
調査の方向性
Read the linked RFC and coordinate with the current quota, scheduler, settings owners and PR #5187 before choosing an unowned acceptance gap. Starting points are loopx/control_plane/quota, loopx/control_plane/scheduler and apps/presentation/dashboard/src/features/personal-workspace; include affected CLI and Lark entry points. Done means closing only the accepted scope and reconciling the integrated revision, commands, test evidence and remaining gates here.
索引モデルが issue の本文から書いたものです。
説明
Outcome / 目标
完成自动执行准入与跨入口反馈。One task tracks this RFC's delivery; keep implementation PRs and milestone evidence here instead of creating a parallel task tree.
Canonical design: RFC. Roadmap: S2/S4/S5/S7, under #4574. Design acceptance is distinct from implementation, live qualification and promotion.
Current boundary
Source audit: main at ce3862e33 (2026-09-28). This is source/PR inspection, not a new test or live-qualification claim.
M1 owner floor and managed Turn admission shipped in #4921/#4929. The current RFC also records M3 settings and #5186 fixes Agent selection. Live timer-to-hook coverage, non-Turn launchers and next-eligibility parity remain distinct gaps.
Work remaining
- Complete real schedule apply/readback and trustworthy automatic-start identity on supported hosts; explicitly show unsupported launchers.
- Finish shared next-eligible/wait feedback across existing settings, CLI and Lark; preserve inherited Goal/Agent/automation policy.
Ownership and ongoing work
Continue the existing quota/scheduler/settings owners. PR #5187 changes capability-settings scope; coordinate that companion instead of adding another editor. Creating this task does not activate or rebind any automation.
Contribution route: implementation/integration overlaps active work. Start from the linked current owners/PRs and identify an unowned acceptance gap in a claim comment; do not begin a competing rewrite.
Acceptance
- Concurrent starts admit once; reserved-but-unstarted crash recovery remains resumable and confirmed attempts cannot replay as fresh starts.
- Manual interval bypass affects only the interval and cannot bypass other authority/quota gates.
- Configuration target changes invalidate previews; restart, backoff/reset and downgrade preserve the documented v1/v2 boundary.
- Reconcile the RFC's current delivery checkpoint and this issue with the integrated revision, commands, passed/failed/untested evidence and remaining gates. Close the accepted scope only; no claim that a merged PR alone completes the RFC.
Starting points and delivery boundary
- loopx/control_plane/quota
- loopx/control_plane/scheduler
- apps/presentation/dashboard/src/features/personal-workspace
Base: latest main. Reuse the existing typed owner and provider boundaries. Include affected CLI/frontend/Lark companions; verify real entrypoints and backend where changed. Preserve existing first-screen review and maintainer merge gates. Public artifacts contain only synthetic/public-safe evidence, no private operational state. This task does not authorize provider promotion, benchmark launches, release/deployment or unrelated protected effects.
- 主要言語
- Python
- スター
- 6.2k
- フォーク
- 596
- 平均マージ
- 7時間 47分
- マージ済み PR(30日)
- 904
環境構築
- Dockerfile・Docker Compose ファイルなし
- プルリクエストのテンプレートあり
- コントリビューションガイドを読む
はじめの一歩
- issue を最後まで読み、次にプロジェクトのコントリビューションガイドを読みます。
- 着手することを issue にコメントします — 二人が同じ作業をするのを防げます。
- リポジトリをフォークし、ブランチを切って変更します。
- issue 番号を参照したプルリクエストを送ります。
loopx-project/loopx のほかの issue
-
難易度 2/5 1〜3時間 初心者へのやさしさ 84/100
loopx-project/loopx#6842 · コメント 1 件 ·
メンテナーはふだん 1 日以内に返信
-
難易度 2/5 1〜3時間 初心者へのやさしさ 72/100
loopx-project/loopx#6108 ·
メンテナーはふだん 1 日以内に返信
-
難易度 2/5 1〜3時間 初心者へのやさしさ 65/100
loopx-project/loopx#5688 · コメント 2 件 ·
メンテナーはふだん 1 日以内に返信
-
難易度 2/5 1〜3時間 初心者へのやさしさ 60/100
loopx-project/loopx#5632 · コメント 1 件 ·
メンテナーはふだん 1 日以内に返信
-
難易度 2/5 1〜3時間 初心者へのやさしさ 65/100
loopx-project/loopx#5443 · コメント 1 件 ·
メンテナーはふだん 1 日以内に返信
loopx-project/loopx の issue をすべて見る
似ている issue
-
[Bug]: Revit selector reads process ids 2000-2099 as years (flaky AgentClientTests.AYearOrAProcessIdSelectsTheHost)対応中かも @Wurschdhaud が今日担当しました。 オープン
難易度 2/5 1〜3時間 初心者へのやさしさ 83/100
pyrevitlabs/pyRevit#3817 ·
メンテナーはふだん 1 日以内に返信
-
難易度 1/5 1時間未満 初心者へのやさしさ 85/100
521xueweihan/HelloGitHub#4074 ·
-
follow-up
難易度 2/5 1〜3時間 初心者へのやさしさ 62/100
メンテナーはふだん 1 日以内に返信
-
Helm chart: allow setting ingressClassName on the Ingress対応中かも @commarla が今日担当しました。 オープン
難易度 2/5 1〜3時間 初心者へのやさしさ 85/100
pgadmin-org/pgadmin4#10658 ·
メンテナーはふだん 1 日以内に返信
-
難易度 2/5 1〜3時間 初心者へのやさしさ 72/100