[roadmap] Q4 2026 Model providers: commercial APIs and self-hosting / 商用与自部署模型

オープン
#264 コメント 0 件 リアクション 0 件 担当者 0 名 GitHub で見る

メンテナーはふだん 1 日以内に返信

まだ誰も着手していません。

評価

難易度
5/5
見積もり時間
1週間以上
初心者へのやさしさ
25/100
issue の種類
機能追加
明瞭さ
おおむね明確
活発さ
活発
技術スタック
typescript
領域
ai, backend, devops

調査の方向性

Start by reading the parent roadmap #107 and related issues #240, #234, #235, #236, #237, #238, #224, #205, #230 and #215, then review the linked vLLM-Omni proposals. The issue spans provider adapters, self-hosting, hardware qualification, inference recovery and end-to-end creative acceptance, with owners and capacity still unconfirmed. Done means representative commercial and self-hosted workflows pass real inference through delivery against the listed acceptance criteria.

索引モデルが issue の本文から書いたものです。

説明

area:provider type:meta

Parent roadmap: #107. Proposed November–December 2026 delivery; owners, hardware and capacity require confirmation.

Goal and scope / 目标与范围

Offer usable commercial and self-hosted creation paths. Distinguish a catalog preset, protocol compatibility, real inference and creative acceptance. Prioritize providers needed by the November reference film rather than promising every tracked integration.

交付可实际创作的商用和自部署路径,区分预设存在、协议接通、真实推理和质量验收;优先支持11月参考成片,不承诺全部待接入服务在Q4完成。

Work and milestones / 工作与里程碑

  • By November 30 · P0: update #240's region/account/model/modality evidence. Fix actual inputs, reference limits, first/last-frame roles, sampling parameters and error classification. Qualify a stable version-pinned provider combination for the reference film, including local vLLM-Omni where supported.

  • First half of December · P0/P1: complete selected commercial paths, including the tracked Zhipu text/image/video/TTS work. Verify one-account/one-key full workflows where a provider supports them; specialist services qualify only for supported modalities.

  • First half of December · P1: deliver one hardware-defined self-hosting setup with deployment guidance, capability detection, connection and real inference. Coordinate vLLM-Omni's capabilities, ASR and hardware-doctor interfaces. Disable unavailable stages with explanations rather than discovering them through failed generation.

  • By December 31 · P1: expand measured RTX memory tiers and Apple Silicon qualification as upstream support allows; validate voice identity and cross-request isolation. Use matched sample sets to measure quality, latency, peak memory and cost, including quantization/offload/cache trade-offs.

  • Query supported cancellation/unknown task state; validate late results and subsequent requests. Upstream proposals are dependencies to coordinate, not already available guarantees.

  • **11月底 · P0:**更新#240地区、账号、模型、模态和证据;修复真实输入、参考限制、首尾帧角色、采样参数和错误分类,固定首条成片可用的服务组合及版本。

  • **12月上半月 · P0/P1:**推进选定商用路径及智谱文本/图片/视频/TTS;支持四模态的服务验证同账号同Key全流程,专项服务按实际模态验收。

  • **12月上半月 · P1:**至少交付一个明确硬件的自部署组合,包括部署、能力探测、连接和真实推理;对齐vLLM-Omni能力探测、ASR及硬件诊断接口,未部署阶段明确不可用。

  • **12月底 · P1:**按上游支持扩大RTX显存分档和Apple Silicon验证;检查音色与跨请求隔离,用固定样例衡量质量、耗时、峰值内存和费用,验证量化/offload/cache收益。

  • 查询取消和未知任务状态,验证迟到结果及后续请求;上游提案作为协作依赖,不写成已支持保证。

Task ownership and implementation

Task Contributor Implementation Status
Provider integrations #240 @wuli666, @Zhangbo-cn, @PCcoding666 PRs tracked in #240 Assigned by integration
BigModel account reuse #234 @PCcoding666 #289 PR open
Local Omni service preset #224 @Xingkai98 #325 PR open; V1
Capability discovery and input validation #224 @bread-lxy #266 PR open; V2
Hardware-aware Omni deployment @WEIXILIN0307 #259 PR open; claimed under #107
FastH3 first/last-frame anchors #290 @Probiotics5333 #292 PR open
Kling video #142 @barkly1te — Assigned
MOSS image #138 @barkly1te — Assigned
Voice management #205 @Ethereal49 — Assigned
Offline media checks for quality samples #215 @Xingkai98 — Claim requested; assignment pending; coordinate #273

Implementation and dependencies / 实现影响与依赖

Share capability contracts, asset validation and task recovery across hosted/local services. Existing tasks: #240, #234, #235, #236, #237, #238, #224, #205, #230, #215. Align with vllm-project/vllm-omni#8264 (Q4) and vllm-project/vllm-omni#10007 (consumer serving), including #10008/#10009 in that repository. Upstream owns serving/runtime optimization; OpenDirector owns setup, adapters, project publication and creative E2E validation.

商用和本地共用能力契约、素材校验及恢复规则;上游负责推理与runtime优化,OpenDirector负责配置引导、适配、结果落库和端到端创作验收。实时双工、世界模型和底层调度不自动扩入本季度范围。

Coordinate MiniMax-H3-Image and Highspeed HEIC/HEIF reference preparation, request limits, and real image-editing validation through #282, tracked under #262.

C1 · Character replacement

Coordinate C1 #351 under #263 on single/multiple references #352/#353, continuation #355 and reverse generation #356. Verify guide intervals, reference/audio alignment, continuation windows, generation direction and ordered LoRA weights in the selected model contract.

Acceptance / 验收标准

  • Matrix distinguishes endpoint regions and verified capabilities; unsupported stages explain why. / 地区端点和已验证能力明确,不可用原因可读。
  • Representative commercial and at least one self-hosted combination complete real inference, adoption, editing and delivery. / 商用代表路径和至少一个自部署组合完成真实推理到成片。
  • Inputs, output media and provenance are queryable; failures/unknown submissions do not blindly duplicate work. / 固定输入、输出和来源可查,无盲目重复提交。
  • Hardware recipes record versions, memory tiers and limits; quality/resource comparisons distinguish mocks from real services. / 配置记录版本、资源分档和限制,模拟与真实验收分开。
主要言語
TypeScript
スター
119
フォーク
16
平均マージ
16時間 13分
マージ済み PR(30日)
195

環境構築

このプロジェクトには開発コンテナ、Dockerfile、コントリビューションガイドがありません。まず README を読み、一般的な手順ははじめてのコントリビューションガイドを参照してください。

はじめの一歩

  1. issue を最後まで読み、次にプロジェクトのコントリビューションガイドを読みます。
  2. 着手することを issue にコメントします — 二人が同じ作業をするのを防げます。
  3. リポジトリをフォークし、ブランチを切って変更します。
  4. issue 番号を参照したプルリクエストを送ります。

ThinkFlowLab/OpenDirector のほかの issue

ThinkFlowLab/OpenDirector の issue をすべて見る

似ている issue

TypeScript の issue をもっと見る

新しい issue をメールで受け取る

初心者向けの GitHub issue を短くまとめたダイジェスト。