test(continuity): bring back the additional-CA removal checks as a disruption

オープン
#5,917 コメント 0 件 リアクション 0 件 担当者 0 名 GitHub で見る

まだ誰も着手していません。

評価

難易度
3/5
見積もり時間
1〜2日
初心者へのやさしさ
62/100
issue の種類
機能追加
明瞭さ
おおむね明確
活発さ
活発
技術スタック
rust
領域
testing

調査の方向性

Read the two dropped checks in e2e/rust/tests/additional_ca.rs first, then decision D and E in the #5297 plan comment for what was intentionally left out. Find the runner's disruption registry and an existing disruption installed under /var/lib/openshell-qualification/disruptions/ to copy its shape, and look at an existing continuity scenario to see how seed and verify are written. Done means a remove-additional-ca entry in the registry, an installer that strips the CA from the gateway config and restarts it, and a scenario whose seed proves trust and whose verify proves it is gone — while still passing under the other disruptions.

索引モデルが issue の本文から書いたものです。

説明

topic:testing

User Story

I'm moving the e2e/rust tests onto testkit (#5281). The port drops two additional_ca checks because they restart the gateway and edit its host files, which ordinary tests must not do. I want a tracked way to bring that coverage back if CA rotation becomes a priority.

Description

e2e/rust/tests/additional_ca.rs has two checks the port drops (decision D in the #5297 plan):

  • tampering with the configured additional-CA file, then restarting the gateway;
  • removing the additional CA, then restarting the gateway, and checking that sandboxes no longer trust it.

They can come back as a continuity scenario (#3521) under a new disruption, for example remove-additional-ca. The installer stages the disruption as an executable under /var/lib/openshell-qualification/disruptions/; it removes the CA from the gateway config and restarts the gateway. seed checks that a sandbox trusts a server signed by the CA; verify checks that it doesn't any more.

Context

  • Decision D (drops) and E (how the additional-CA test gets its CA) in the #5297 plan.
  • Continuity runs every scenario under every disruption, so the new scenario must tolerate the other disruptions, and the other scenarios must tolerate this one.
  • Low priority. Not needed to delete e2e/rust.

Definition of Done

  • A remove-additional-ca disruption in the runner's registry, with an installer executable on at least one row.
  • A continuity scenario that checks trust before the disruption and its absence after.
主要言語
Rust
スター
21.5k
フォーク
2.1k
PR マージ指標
30日以内にマージされた PR はありません

環境構築

はじめの一歩

  1. issue を最後まで読み、次にプロジェクトのコントリビューションガイドを読みます。
  2. 着手することを issue にコメントします — 二人が同じ作業をするのを防げます。
  3. リポジトリをフォークし、ブランチを切って変更します。
  4. issue 番号を参照したプルリクエストを送ります。

NVIDIA/OpenShell のほかの issue

NVIDIA/OpenShell の issue をすべて見る

似ている issue

Rust の issue をもっと見る

新しい issue をメールで受け取る

初心者向けの GitHub issue を短くまとめたダイジェスト。