Hacktoberfest 2026:メンテナが10月に向けて印を付けた、オープンで初心者向けの issue。 Hacktoberfest の issue を見る

[Epic] Phase 16 · Trust surface hardening: remaining steps S4–S16

オープン
#903 コメント 0 件 リアクション 0 件 担当者 0 名 GitHub で見る

まだ誰も着手していません。

評価

難易度
5/5
見積もり時間
1週間以上
初心者へのやさしさ
8/100
issue の種類
バグ
明瞭さ
おおむね明確
活発さ
活発
技術スタック
python
領域
security

調査の方向性

This is a tracking epic, not a task to start on directly. Read docs/roadmap/phase-16-trust-surface-hardening.md for the S4-S16 step plan and CONTRIBUTING.md's 'Finding Work' section for how sub-issues are claimed. Pick an open step sub-issue whose scope you can reach from its listed files, and confirm it is unclaimed. Done here means every sub-issue is closed, so no code change is expected from this issue.

索引モデルが issue の本文から書いたものです。

説明

epic phase: 16 source: roadmap

Epic · Roadmap · 15 issue(s)

Scope

The remaining steps of Phase 16 — Trust Surface Hardening, the execution plan approved on 2026-07-30 for the 83 remediation units of the 2026-07-29/30 full-project review. Pre-work and steps S1-S3 are delivered (13 of the 83 units closed); the 70 units in S4-S16 and the two standards those steps depend on are open.

Order. Behaviour → the contracts that describe behaviour → the documents that describe the contracts; work the steps in S4 → S16 order — no step reopens a file an earlier step settled for the same reason. S12 needs the SBOM / supply-chain standard and S13 the Docker standard first.

Each step is one root-cause family committed on its own, followed by an Opus review round and then a Sonnet review round, each with verified findings fixed before the next step begins. Every step issue lists the October 2026 review issues that track its units; close those from the step's PR where it fixes them.

How to work on it

Work the steps in S4 → S16 order (S12 and S13 also wait for their standard); claim a whole step, not a fragment of one, because each step lands as one root-cause family with its own review rounds. The two standards can be written at any time. See CONTRIBUTING.md, Finding Work: Issues and the Project Board; progress shows in the sub-issue list and in the project's Sub-issues progress field.

Done when

  • Every sub-issue is closed (done, or closed with a reason).

Planned in docs/roadmap/phase-16-trust-surface-hardening.md (read at f94595f). Unit IDs (F-W20260729-…) come from the 2026-07-29/30 full-project review; the issue numbers next to them are the October 2026 review's records of the same defects.

主要言語
Python
スター
9
フォーク
1
平均マージ
8時間 10分
マージ済み PR(30日)
5

環境構築

はじめの一歩

  1. issue を最後まで読み、次にプロジェクトのコントリビューションガイドを読みます。
  2. 着手することを issue にコメントします — 二人が同じ作業をするのを防げます。
  3. リポジトリをフォークし、ブランチを切って変更します。
  4. issue 番号を参照したプルリクエストを送ります。

HodeTech/ForgeLM のほかの issue

HodeTech/ForgeLM の issue をすべて見る

似ている issue

Python の issue をもっと見る

新しい issue をメールで受け取る

初心者向けの GitHub issue を短くまとめたダイジェスト。