Hacktoberfest 2026: le issue che i maintainer hanno segnato per ottobre, aperte e adatte ai principianti. Sfoglia le issue Hacktoberfest

Physical limit on the ramp-down time

Aperta
#4,191 0 commenti 0 reazioni 1 assegnatario Vedi su GitHub

I maintainer di solito rispondono entro 1 giorno

@mkovari ci sta già lavorando.

Dal 22/4/2026.

Valutazione

Questa issue non è ancora stata valutata.

Descrizione

Physics

For a pulsed machine, the duration of starting and stopping the pulse is significant. While numerous Issues have addressed the ramp-up time, the ramp-down time can also be important. This preprint addresses this issue:
On the timescales of controlled termination of tokamak plasmas,
S Van Mulders, O Sauter

While Boozer and Fitzpatrick have been engaged in a slanging match about this (refs 8 and 9), Van Mulders and Sauter seem to have done a real calculation. (I don't claim to have read the paper.) Their conclusion is actually rather favorable.

Image Image

Proposed solution

We could use this formula to determine the ramp-down time, which will contribute to the total time duration for which no power is produced.

We just need to know $l_{i3}$. This is calculated, but see #1878 for a lengthy discussion.

Lingua principale
Python
Stelle
74
Fork
29
Merge medio
3g 21h
PR unite (30g)
31

Preparare l'ambiente

Come iniziare

  1. Leggi tutta la issue e poi la guida ai contributi del progetto.
  2. Commenta sulla issue per dire che te ne occupi tu — evita che due persone facciano lo stesso lavoro.
  3. Fai un fork del repository e lavora su un branch.
  4. Apri una pull request che faccia riferimento al numero della issue.

Altre issue di ukaea/PROCESS

Tutte le issue di ukaea/PROCESS

Issue simili

Altre issue su Python

Ricevi le nuove issue nella tua casella

Un breve riepilogo di issue GitHub adatte ai principianti.