Hacktoberfest 2026: le issue che i maintainer hanno segnato per ottobre, aperte e adatte ai principianti. Sfoglia le issue Hacktoberfest

Problem: developers can't get node PR checks back within an hour

Aperta
#1,445 0 commenti 0 reazioni 1 assegnatario Vedi su GitHub

I maintainer di solito rispondono entro 1 giorno

@MicBun ci sta già lavorando.

Dal 8/10/2026.

  • #1446 di @MicBun — integrata
  • #1775 di @MicBun — integrata

Valutazione

Questa issue non è ancora stata valutata.

Descrizione

A node pull request that touches the stream or bridge tests runs the slow integration tests, and so does every merge to main. A normal run takes about two and a quarter hours. About one run in ten stalls for two hours and then starts over, which puts the checks at four to five hours. The order book action for this Goal waited four hours on its checks:

I measured where the time goes, and most of it is test setup rather than the tests themselves. The fixes go into kwil-db first, then into the node CI workflow.

Outcome

The slow integration tests on a node pull request finish within an hour, and a stalled run fails within minutes instead of two hours.

Part of:

Lingua principale
Go
Stelle
7
Fork
3
Merge medio
14h 30m
PR unite (30g)
12

Preparare l'ambiente

Come iniziare

  1. Leggi tutta la issue e poi la guida ai contributi del progetto.
  2. Commenta sulla issue per dire che te ne occupi tu — evita che due persone facciano lo stesso lavoro.
  3. Fai un fork del repository e lavora su un branch.
  4. Apri una pull request che faccia riferimento al numero della issue.

Altre issue di trufnetwork/node

Tutte le issue di trufnetwork/node

Issue simili

Altre issue su Go

Ricevi le nuove issue nella tua casella

Un breve riepilogo di issue GitHub adatte ai principianti.