[self-care:dashboard-review] Fix "Agnetic" typo in Overview weekly rhythm label
I maintainer di solito rispondono entro 1 giorno
Nessuno ha ancora preso questa issue.
Valutazione
- Difficoltà
- 2/5
- Tempo stimato
- 1-3 ore
- Idoneità per principianti
- 82/100
- Tipo di issue
- Bug
- Chiarezza
- Specificata chiaramente
- Stato di attività
- Attiva
- Stack tecnologico
- javascript
- Ambito
- frontend
Direzione di ricerca
Inizia con dashboard/site/src/components/factory-rhythm.js e le asserzioni indicate in dashboard/site/test/unit/factory-overview-components.test.js e dashboard/site/test/e2e/overview.spec.js. Aggiorna l'intestazione e il nome accessibile in “Agentic Workflow runs”, poi esegui npm test e npm run lint da dashboard/site/; il lavoro è concluso quando i test passano e Overview mostra il testo corretto.
Scritto dal modello di indicizzazione a partire dal testo della issue.
Descrizione
All three persona assessments completed. 1 verified defect: the Overview weekly-rhythm panel reads "Agnetic Workflow runs" instead of "Agentic Workflow runs". All personas graded the dashboard workable (CFO, CTO) or inefficient (CSO), mainly because the data import was still running.
Action: A maintainer should assign this issue to Copilot. The acceptance check is that the Overview renders "Agentic Workflow runs" and the related tests pass.
View grades
view-grades.json (dashboard build run 39044082669) contained 0 graded views and 0 findings. No metric-level evidence is available. The grader's methodology references are Shannon 1948, Cleveland & McGill 1984, Mackinlay 1986, Purchase 1997, and Ngo 2003.
Verified defects
- Typo in the Overview weekly-rhythm heading and ARIA label.
- Expected: "Agentic Workflow runs".
- Observed: "Agnetic Workflow runs". The live page shows this as the region heading and in its accessible name.
- Source evidence:
dashboard/site/src/components/factory-rhythm.js:27-28. Tests assert the misspelling indashboard/site/test/unit/factory-overview-components.test.js(lines 86, 88, 118) anddashboard/site/test/e2e/overview.spec.js:273. - Viewport: desktop only. I did not check mobile.
Persona assessments
CFO (optimistic), efficiency: workable
- Question: Which repositories and workflows drive AI Credit spend, and does that cost show up as operational value?
- Answer: The Cost page shows $319.00 total, with githubnext/gh-aw-cao at $277.22. The value half was not verifiable because grader results and value gains were 0.
- Path: #page-overview, #page-workflows, #page-graders, #page-maintenance, #page-cost.
- Rationale: The cost answer was quick to find, but the import dialog and loading states appeared on every route.
CSO (skeptical), efficiency: inefficient
- Question: What is our security posture, and do we need to act now?
- Answer: Not answerable. Firewall and Graders stayed on "Loading", and the Overview showed an incomplete import.
- Path: #page-overview, #page-firewall, #page-graders, #page-workflows, #page-overview.
- Rationale: Repeated 15–30 s waits produced no complete snapshot.
CTO (hurried), efficiency: workable
- Question: Is DevOps infrastructure healthy enough to justify one engineering investment, and which harness weakness should be fixed first?
- Answer: Not answerable. The Overview showed 0% health and coverage, and Updates showed "Upgrade status unavailable" for all three repositories.
- Path: #page-overview, #page-maintenance, #page-configuration, #page-indexing.
- Rationale: Navigation was quick, but the evidence needed for the decision was missing.
- The CTO reported that the Settings link (#page-configuration) rendered the Updates page. I have not verified this.
Improvement suggestions
- Fix the "Agnetic" typo. This is verified and is the single low-effort action.
- Replace the 0% and 0/0 values on the Overview with an explicit "data still importing" or "insufficient data" state while the import is incomplete (CFO, CSO, CTO).
- Replace the perpetual "Loading" label on the Firewall and Graders panels with a reason and a visible Retry action (CSO).
- Replace "Upgrade status unavailable" with a reason such as missing data versus not checked (CTO).
- Check whether #page-configuration renders the Updates page instead of Settings (CTO, unverified).
Incomplete checks
- I did not run the bounded Actions run and registry comparison against the dashboard's displayed 24-hour status.
- I did not run the 390-pixel mobile viewport checks, the table and keyboard checks, or the link checks.
- I did not make a published-versus-expected campaign inventory comparison. The live dashboard data was still importing, so comparison evidence was unavailable.
- All three persona runs ended with status
incompletebecause the import never finished.
Agent prompt
Fix the misspelling "Agnetic Workflow runs" to "Agentic Workflow runs" in dashboard/site/src/components/factory-rhythm.js (the subtitle and ariaLabel). Update the matching assertions in dashboard/site/test/unit/factory-overview-components.test.js and dashboard/site/test/e2e/overview.spec.js. Then run npm test and npm run lint from dashboard/site/.
Control Plane
- Correlation ID:
39053881894-2123 - Central repository:
githubnext/gh-aw-cao - Control plane run: https://github.com/githubnext/gh-aw-cao/actions/runs/39053881894
References
- Dashboard: https://githubnext.github.io/gh-aw-cao/cao/
- Dashboard build run: https://github.com/githubnext/gh-aw-cao/actions/runs/39044082669
- Control plane run: https://github.com/githubnext/gh-aw-cao/actions/runs/39053881894
cao: githubnext/gh-aw-cao, correlation: 39053881894-2123
Generated by SelfCare / Dashboard · copilot · auto · 27.8 AIC · ⌖ 0.826 AIC · ⊞ 14.7K · ◷
- expires on Oct 31, 2026, 5:39 PM UTC
- Lingua principale
- JavaScript
- Stelle
- 8
- Fork
- 5
- Merge medio
- 2h 1m
- PR unite (30g)
- 851
Preparare l'ambiente
- Nessun Dockerfile né file Docker Compose
- Nessun modello di pull request
- Leggi la guida per i contributori
Come iniziare
- Leggi tutta la issue e poi la guida ai contributi del progetto.
- Commenta sulla issue per dire che te ne occupi tu — evita che due persone facciano lo stesso lavoro.
- Fai un fork del repository e lavora su un branch.
- Apri una pull request che faccia riferimento al numero della issue.
Altre issue di githubnext/gh-cao
-
repo-assist repo-assist:issue-triage
Difficoltà 2/5 1-3 ore Idoneità per principianti 66/100
githubnext/gh-cao#19642 ·
I maintainer di solito rispondono entro 1 giorno
-
agentic-workflows self-care self-care:reactive-ui-expert
Difficoltà 1/5 Meno di un'ora Idoneità per principianti 65/100
githubnext/gh-cao#19591 ·
I maintainer di solito rispondono entro 1 giorno
-
software-development-practices software-development-practices:nist-ssdf
Difficoltà 2/5 1-3 ore Idoneità per principianti 70/100
githubnext/gh-cao#19534 ·
I maintainer di solito rispondono entro 1 giorno
-
cao-evolution cao-evolution:compiler-security
Difficoltà 2/5 1-3 ore Idoneità per principianti 65/100
githubnext/gh-cao#19373 ·
I maintainer di solito rispondono entro 1 giorno
-
cao-evolution cao-evolution:compiler-security
Difficoltà 1/5 Meno di un'ora Idoneità per principianti 86/100
githubnext/gh-cao#17586 ·
I maintainer di solito rispondono entro 1 giorno
Tutte le issue di githubnext/gh-cao
Issue simili
-
needs-triage
Difficoltà 2/5 1-3 ore Idoneità per principianti 76/100
melodic-software/claude-code-plugins#9619 ·
I maintainer di solito rispondono entro 1 giorno
-
bug Frontend P2-medium UI UX
Difficoltà 1/5 Meno di un'ora Idoneità per principianti 76/100
Deepak3699/Ai_Mentor#427 ·
I maintainer di solito rispondono entro 1 giorno
-
resource.reload() while params is in error switches the resource to 'idle' instead of retryingApertaarea: core
Difficoltà 2/5 1-3 ore Idoneità per principianti 78/100
I maintainer di solito rispondono entro 1 giorno
-
venn: a name that starts with set-, union-, text- or style- followed by a letter is a parse errorAperta
Difficoltà 2/5 1-3 ore Idoneità per principianti 82/100
obsidianmd/pele#65 ·
I maintainer di solito rispondono entro 3 giorni
-
needs-triage
Difficoltà 2/5 1-3 ore Idoneità per principianti 78/100
11ty/buildawesome#4407 · 1 reazione ·
I maintainer di solito rispondono entro 1 giorno