Hacktoberfest 2026: le issue che i maintainer hanno segnato per ottobre, aperte e adatte ai principianti. Sfoglia le issue Hacktoberfest

[Bug][Dashboard] Engineering Throughput PR time panels count PRs without a project_pr_metrics row as 0 hours

Chiusa
#9,225 0 commenti 0 reazioni 0 assegnatari Vedi su GitHub

I maintainer di solito rispondono entro 3 giorni

@chenwei791129 ci sta già lavorando.

Dal 14/10/2026.

  • #9226 di @chenwei791129 — aperta

Valutazione

Difficoltà
3/5
Tempo stimato
Mezza giornata
Idoneità per principianti
22/100
Tipo di issue
Bug
Chiarezza
Specificata chiaramente
Stato di attività
Ferma
Stack tecnologico
grafana, mysql, postgresql, sql

Direzione di ricerca

The affected queries live in the Engineering Throughput and Cycle Time dashboard JSON files, in both MySQL and PostgreSQL variants, including the team-view file. Start with the LEFT JOIN project_pr_metrics plus coalesce(..., 0) in the PR Cycle Time query, and check whether PRs without a metrics row are excluded. Done means those PRs no longer count as 0 h and the panels show No data when no row exists. PR #9226 is already open against this issue, so check it before starting.

Scritto dal modello di indicizzazione a partire dal testo della issue.

Descrizione

Search before asking
  • I had searched in the issues and found no similar issues.
What happened

The PR time panels of the Engineering Throughput and Cycle Time dashboards treat a merged PR that has no
row in project_pr_metrics as a PR that took 0 hours. The PR should be left out of the average instead.

Affected panels (MySQL and PostgreSQL variants of each dashboard):

Dashboard Panels
engineering-throughput-and-cycle-time.json PR Cycle Time, PR Coding Time, PR Pickup Time, PR Review Time, PR Deploy Time
engineering-throughput-and-cycle-time-team-view.json Total Cycle Time(h), PR Coding Time(h), PR Pickup Time(h), PR Review Time(h), PR Deploy Time(h)

All ten queries have the same shape (MySQL version of PR Cycle Time, trimmed):

with _prs as (
  SELECT
    pr.id,
    pr.merged_date as pr_merged_date,
    coalesce(prm.pr_cycle_time/60, 0) as cycle_time      -- a missing row becomes 0
  FROM pull_requests pr
    left join project_pr_metrics prm on pr.id = prm.id
    join project_mapping pm on pr.base_repo_id = pm.row_id and pm.table = 'repos'
  WHERE $__timeFilter(pr.merged_date) and pm.project_name in (${project})
  GROUP BY 1,2,3
)
SELECT ..., avg(cycle_time) FROM _prs GROUP BY ...

The set of PRs and the time axis come from pull_requests, while the metric values come from
project_pr_metrics. Because of LEFT JOIN + coalesce(..., 0), a merged PR without a project_pr_metrics
row enters avg() as 0 and pulls the average down:

pull_requests       project_pr_metrics        value used by the panel
─────────────       ──────────────────        ───────────────────────
PR A (merged)  ──▶  pr_cycle_time = 14h  ──▶  14h
PR B (merged)  ──▶  pr_cycle_time = 10h  ──▶  10h
PR C (merged)  ──▶  (no row)             ──▶   0h   ◀ should be excluded
                                              avg = 8h (expected: 12h)

project_pr_metrics is written only by the DORA plugin (calculateChangeLeadTime in
backend/plugins/dora/tasks/change_lead_time_calculator.go). The most common way to hit this bug is a project
with DORA metrics disabled. In that case pull_requests has merged PRs, but project_pr_metrics has no rows
for them, so all five panels show a flat 0 h. It looks as if every PR was finished instantly, when in fact
no PR time data is available. The dashboard's "Data Sources Required" text does not mention DORA, so users
have no hint about the cause.

The bug depends only on whether a PR has a matching project_pr_metrics row. The reason the row is missing
does not matter.

What do you expect to happen

PRs without a project_pr_metrics row should be left out of these averages (removed from the denominator)
instead of being counted as 0.

If no PR in the selected range has a row (e.g. DORA is not enabled for the project), the panels should show
"No data" instead of 0 h.

How to reproduce
  1. Create a project with a GitHub or GitLab repository and keep DORA metrics disabled in the project settings.
  2. Collect data so that pull_requests contains merged PRs.
  3. Open Engineering Throughput and Cycle Time (or its Team View) and select the project.
  4. PR Cycle / Coding / Pickup / Review / Deploy Time show 0 h in every period, even though there are merged PRs.

To count the merged PRs that these panels average in as 0:

SELECT count(*)
FROM pull_requests pr
  JOIN project_mapping pm ON pr.base_repo_id = pm.row_id AND pm.`table` = 'repos'
  LEFT JOIN project_pr_metrics prm ON pr.id = prm.id
WHERE pr.merged_date IS NOT NULL
  AND pm.project_name = '<your project>'
  AND prm.id IS NULL;
Anything else

Proposed fix (open to discussion)

  • In the 20 affected queries (2 dashboards × 5 panels × MySQL/PostgreSQL), change
    LEFT JOIN project_pr_metrics to an inner JOIN.
  • Keep the existing coalesce(..., 0) on the per-row values. The comment above it says the goal is to
    "make sure cycle_time equals the sum of the four metrics". A row can still have a NULL coding, pickup, review
    or deploy time, and those values are still treated as 0. All five panels still average over the same set of
    PRs (those that have a row), so this intent is preserved. The only change is that PRs with no row at all are
    dropped.
  • When DORA is enabled, every merged PR in the project gets a row, so those projects see no change in values.
    Only the "no row" case changes, from 0 h to excluded (or "No data").

Not affected (no change needed)

  • dora-details-lead-timefor-changes.json uses the same LEFT JOIN + coalesce pattern, but filters on
    $__timeFilter(prm.pr_deployed_date), which already drops PRs without a row.
  • DORA.json, dora-by-team.json, kiro-dora.json, kiro-credits-dora.json,
    github-copilot-dora-correlation.json and monorepo-subprojects.json either inner-join or select directly
    from project_pr_metrics, or AVG() the nullable column without coalesce (NULLs are skipped).

Related

  • #7398 reported PR Cycle Time showing 0 when data is incomplete. This issue is a different case: the PR has
    no project_pr_metrics row at all.
Version

v1.0.3-beta15 (the same queries are still on main at 4ad2f66df)

Are you willing to submit PR?
  • Yes I am willing to submit a PR!
Code of Conduct
Lingua principale
Go
Stelle
3.2k
Fork
824
Merge medio
3g 17m
PR unite (30g)
48

Preparare l'ambiente

Apri in Codespaces

Avvia il container di sviluppo del progetto nel browser, con il tuo account GitHub.

  • Nessun Dockerfile né file Docker Compose
  • Ha un modello di pull request
  • Nessuna guida per i contributori

Come iniziare

  1. Leggi tutta la issue e poi la guida ai contributi del progetto.
  2. Commenta sulla issue per dire che te ne occupi tu — evita che due persone facciano lo stesso lavoro.
  3. Fai un fork del repository e lavora su un branch.
  4. Apri una pull request che faccia riferimento al numero della issue.

Altre issue di apache/devlake

Tutte le issue di apache/devlake

Issue simili

Altre issue su Go

Ricevi le nuove issue nella tua casella

Un breve riepilogo di issue GitHub adatte ai principianti.