CleverRaven/Cataclysm-DDA
Voir sur GitHub"Place wall wiring" leaves behind an incomplete construction you can't interact with.
Open
#67 002 ouverte le 18 juil. 2023
(S2 - Confirmed)Appliance/Power GridHelp Wanted
Métriques du dépôt
- Stars
- (9 264 stars)
- Métriques de merge PR
- (Merge moyen 6j 5h) (292 PRs mergées en 30 j)
Description
Describe the bug
When I place wall wiring it leaves behind an incomplete construction you can't interact with. It looks really jarring.
Attach save file
Steps to reproduce
Gather materials and tools
Place wall wirings
Observe the incomplete construction under the wall wiring
Expected behavior
After placing wall wiring the construction stuff should disappear.
Screenshots
Versions and configuration
- OS: Windows
- OS Version: 10.0.19045.3208 (22H2)
- Game Version: 8ef5de8 [64-bit]
- Graphics Version: Tiles
- Game Language: English [en]
- Mods loaded: [ Dark Days Ahead [dda], Disable NPC Needs [no_npc_food], Portal Storms Ignore NPCs [personal_portal_storms], Slowdown Fungal Growth [no_fungal_growth], No Rail Stations [No_Rail_Stations], Aftershock [aftershock], Bionic Professions [package_bionic_professions], Blaze Industries [blazeindustries], Magiclysm [magiclysm], Mind Over Matter [mindovermatter], Xedra Evolved [xedra_evolved], Bombastic Perks [bombastic_perks], Translate Complex Dialogue [translate_dialogue], Stats Through Kills [stats_through_kills], Tamable Wildlife [Tamable_Wildlife] ]
Additional context
No response