Home page of the admin with plugin dashboard widgets
Maintainers usually reply within 1 day
Nobody has claimed this yet.
Assessment
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Newbie friendliness
- 49/100
Research direction
Read docs/planning/admin-technical-spec.md sections 5.1 and 10.4 (A-22), then trace the admin home page and the media plugin manifest for dashboard widget entry points. The issue also depends on A-19; #3096 is merged. Done means the widget grid, permission and plugin gating, error tile, responsive and right-to-left behavior, accessibility check, and component and end-to-end coverage meet the listed acceptance criteria.
Written by the indexing model from the issue text.
Description
Problem
Row 8.9 asks that a plugin adds widgets to the dashboard, each visible by permission or role. The home page of the admin is a placeholder, and nothing renders a [DashboardWidget].
Proposal
- The home page lays out the widgets of the manifests in a grid by their size hint (small, medium, wide), in a stable order: by plugin name, then by the order of the manifest.
- A widget is shown only while its plugin is enabled in the site and the caller holds its permission or role (#3096); its half is loaded when the home page shows it, and a widget that is not visible loads nothing.
- A widget that fails to load or throws shows an error state in its own tile, and the others render.
- Core's own tiles: the content types the caller may read, as links to their lists. With no widget and no type the page says so.
- The media half declares one small widget, the latest uploads, so that the page is proven on a real half.
Acceptance
- With the media plugin enabled the home page shows its widget; in a site where it is disabled the widget is absent and the half is not fetched
- A caller without the widget's permission does not see it
- A widget that throws leaves the rest of the page working
- The grid reflows on the tablet layout, follows the right-to-left pseudo-culture, and passes the axe-core check in both themes
- Component tests cover the order, the gating and the error tile; an end-to-end case covers the enabled and the disabled site
Design: docs/planning/admin-technical-spec.md, sections 5.1 and 10.4 (A-22). Row 8.9. Needs A-19; #3096 is merged. Size: S.
- Dominant language
- C#
- Stars
- 569
- Forks
- 107
- Avg merge
- 2h 49m
- Merged PRs (30d)
- 397
Getting set up
- Ships a Dockerfile or Docker Compose file
- Has a pull request template
- Read the contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from fluentcms/FluentCMS
-
area:host area:operations type:bug
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day
-
area:build security type:chore
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day
-
area:sdk security type:bug
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day
-
area:content security type:bug
Difficulty 2/5 1-3 hours Newbie friendliness 82/100
Maintainers usually reply within 1 day
-
area:build type:bug
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day
All issues in fluentcms/FluentCMS
Similar issues
-
bug needs-triage
Difficulty 2/5 1-3 hours Newbie friendliness 67/100
microsoft/microsoft-ui-reactor#1567 ·
Maintainers usually reply within 1 day
-
clawsweeper:fix-shape-clear clawsweeper:queueable-fix clawsweeper:source-repro impact:ux-friction issue-rating: 🦞 diamond lobster no-stale P2
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
openclaw/openclaw-windows-node#2287 · 2 comments · 1 reaction ·
Maintainers usually reply within 1 day
-
kind:ux needs-triage
Difficulty 2/5 1-3 hours Newbie friendliness 66/100
elsa-workflows/elsa-foundation#4742 ·
Maintainers usually reply within 1 day
-
priority:P2
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
-
enhancement good first issue help wanted new-language
Difficulty 2/5 1-3 hours Newbie friendliness 82/100