cal: dates before September 1752 use the Gregorian calendar

Abierto
#684 0 comentarios 0 reacciones 0 asignados Ver en GitHub

Los mantenedores suelen responder en 1 día

Nadie ha tomado este issue todavía.

Evaluación

Dificultad
4/5
Tiempo estimado
3-5 días
Aptitud para principiantes
48/100
Tipo de issue
Nueva funcionalidad
Claridad
Bastante claro
Estado de actividad
Activo
Stack tecnológico
rust
Área
cli

Línea de trabajo

Start by locating the Rust implementation and tests for cal, then compare its calendar calculations and option parsing with the examples in the issue. The requested behavior covers Julian dates, reform selection, ISO mode, and year bounds; done means the default output and supported options match the specified util-linux behavior, with tests covering the listed examples.

Escrito por el modelo de indexación a partir del texto del issue.

Descripción

util-linux cal switches to the Julian calendar before the 1752 reform (its default --reform 1752), so September 1752 drops the 3rd to the 13th and earlier months keep their historical weekdays and leap days. cal here uses the Gregorian calendar for every year:

$ cal 9 1752                      util-linux 2.41.5           this cal
                                     September 1752           September 1752
                                  Su Mo Tu We Th Fr Sa     Su Mo Tu We Th Fr Sa
                                         1  2 14 15 16                    1  2
                                  17 18 19 20 21 22 23      3  4  5  6  7  8  9
                                  24 25 26 27 28 29 30     10 11 12 13 14 15 16 ...
  • cal 2 1700: util-linux has a 29th and starts on Thursday; here it ends on the 28th and starts on Monday.
  • cal 1 1: util-linux starts on Saturday, here on Monday.
  • cal -j 9 1752: util-linux numbers the days 245, 246, 258, 259...
  • --reform (1752|gregorian|iso|julian) and --iso are not accepted.

Year bounds also differ: util-linux rejects year 0 ("illegal year value: use positive integer") and accepts 10000, where this one shows January 0000 and rejects 10000 with "invalid date".

The output for 1753 and later already matches. Is following util-linux here wanted? If so I can send a PR: Julian weekdays and month lengths before 1752-09-14 by default, and --reform/--iso to choose.

Checked on main a3b2083 against util-linux 2.41.5 (Fedora 43).

Lenguaje dominante
Rust
Estrellas
230
Forks
62
Merge medio
1 d 2 h
PR fusionados (30 d)
23

Preparar el entorno

Primeros pasos

  1. Lee el issue completo y luego la guía de contribución del proyecto.
  2. Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
  3. Haz un fork del repositorio y trabaja en una rama.
  4. Abre un pull request que haga referencia al número del issue.

Más de uutils/util-linux

Todos los issues de uutils/util-linux

Issues similares

Más issues de Rust

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.