A page with several feed listings writes `index-<id>.xml` files and no `index.xml`
Los mantenedores suelen responder en 1 día
Nadie ha tomado este issue todavía.
Evaluación
- Dificultad
- 4/5
- Tiempo estimado
- 3-5 días
- Aptitud para principiantes
- 45/100
Línea de trabajo
Start with crates/quarto-core/src/project/listing/feed/stage.rs, especially the output naming logic at lines 141–162 referenced in the issue, and read the linked plan's D7 decision. Compare behavior for multiple listings with feed: against Quarto 1, including feed filenames, merged items, and alternate links. Done means the chosen behavior is implemented or a warning is added for the changed feed URL, with the single-feed-listing case covered too.
Escrito por el modelo de indexación a partir del texto del issue.
Descripción
In Quarto 1, a page with listings writes one feed, <stem>.xml, with the items of all listings on the page. Feed options come from the first listing that sets feed:. source
const [dir, stem] = dirAndStem(source);
const finalRelPath = relative(
project.dir,
join(dir, `${stem}.xml`),
);
// ...
// Merge all the items
const items: ListingItem[] = [];
for (const descriptor of descriptors) {
items.push(...descriptor.items);
}
q2 writes one feed per listing with feed:. When more than one listing has it, each file is named <stem>-<listing-id>.xml and there is no <stem>.xml:
# _quarto.yml
project:
type: website
website:
title: Blog
site-url: https://example.com
# index.qmd
---
title: Blog
listing:
- id: y2026
contents: "posts/2026-*.qmd"
feed: true
- id: y2025
contents: "posts/2025-*.qmd"
feed: true
---
q2 0.47.0: index-y2026.xml and index-y2025.xml, and two <link rel="alternate"> in index.html. Quarto 1.12.3: one index.xml with all the posts.
On my blog, the index page has one listing per year. Moving to that layout changed the feed URL from /index.xml to /index-<id>.xml without any message, which breaks existing subscribers. I worked around it with a first listing without id that carries the feed, and an empty template.
This is a deliberate choice (D7 in claude-notes/plans/2026-05-08-listings-L9-rss-feeds.md), based on one listing per page being the common case. The output also differs when only one listing among several has feed:: Quarto 1 writes index.xml with the items of all listings, q2 only with the items of that listing.
The plan mentions an opt-in feed-merge: true if users ask for Quarto 1 behavior. We could instead make the merge the default, so a site moving from Quarto 1 keeps its feed URL and content, and keep per-listing feeds as the opt-in. At least, we could warn when a page with several feed listings no longer writes <stem>.xml.
- Lenguaje dominante
- Rust
- Estrellas
- 316
- Forks
- 23
- Merge medio
- 6 h 50 min
- PR fusionados (30 d)
- 230
Preparar el entorno
- Sin Dockerfile ni archivo de Docker Compose
- Sin plantilla de pull request
- Leer la guía de contribución
Primeros pasos
- Lee el issue completo y luego la guía de contribución del proyecto.
- Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
- Haz un fork del repositorio y trabaja en una rama.
- Abre un pull request que haga referencia al número del issue.
Más de quarto-dev/q2
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 75/100
quarto-dev/q2#1188 · 3 comentarios ·
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 73/100
quarto-dev/q2#1179 ·
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 82/100
quarto-dev/q2#1133 ·
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 76/100
quarto-dev/q2#1103 · 1 comentario ·
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 75/100
quarto-dev/q2#1095 ·
Los mantenedores suelen responder en 1 día
Todos los issues de quarto-dev/q2
Issues similares
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 82/100
limitlessprojects/Go-Hybrid#4764 ·
Los mantenedores suelen responder en 1 día
-
enhancement good first issue ready
Dificultad 2/5 1-3 horas Aptitud para principiantes 68/100
MartinPTielemans/ilo#4238 ·
Los mantenedores suelen responder en 1 día
-
area:compat area:operations documentation ready-for-agent type:afk
Dificultad 2/5 1-3 horas Aptitud para principiantes 74/100
ZcashFoundation/zinder#552 ·
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 85/100
Los mantenedores suelen responder en 1 día
-
Dificultad 2/5 1-3 horas Aptitud para principiantes 62/100
Los mantenedores suelen responder en 1 día