Hacktoberfest 2026: los issues que los mantenedores marcaron para octubre, abiertos y aptos para principiantes. Explorar issues de Hacktoberfest

[server] Oversized lake metadata causes Coordinator disconnections from ZooKeeper and ISR update failures

Abierto
#4,335 0 comentarios 0 reacciones 1 asignado Ver en GitHub

Los mantenedores suelen responder en 1 día

@hanliu0830 ya está trabajando en esto.

Desde el 15/9/2026.

Evaluación

Este issue todavía no se ha evaluado.

Descripción

Search before asking
  • I searched in the issues and found nothing similar.
Fluss version

0.9.0 (latest release)

Please describe the bug 🐞

Environment: Paimon lake tiering with deletion vectors (DV) enabled on the affected table; Fluss on Kubernetes; a three-node ZooKeeper 3.8.4 ensemble on VMs. The Coordinator runs on Linux amd64 with Java 17.0.7.

Observed trigger: During production lake tiering, historical lake snapshot metadata kept accumulating under /<cluster>/tabletservers/tables/<table-id>/laketable. The node held 5,091 snapshot entries (1,048,318 bytes). The next complete setData request was 1,048,596 bytes, exceeding the ZooKeeper server's jute.maxbuffer=1048575.

Expected: Lake snapshot commits complete successfully and ISR updates remain stable.

Actual: ZooKeeper repeatedly closed the Coordinator connection. The Coordinator reported SUSPENDED and lost leadership; Tablets reported NOT_COORDINATOR_LEADER_EXCEPTION when updating ISR. All three ZooKeeper servers logged the following error (address redacted):

java.io.IOException: Len error. A message from <coordinator-address> with advertised length of 1048596 is either a malformed message or too large to process (length is greater than jute.maxbuffer=1048575)

After ZooKeeper connectivity recovered, Tablets continued reporting OPERATION_NOT_ATTEMPTED_EXCEPTION during ISR updates. These failures stopped after the Coordinator was restarted.

Solution

We recovered the cluster with the following temporary workaround:

  1. Set -Djute.maxbuffer=104857600 on all three ZooKeeper servers and restart them one at a time.
  2. Restart the Coordinator, as ISR failures persisted after ZooKeeper connectivity recovered.
  3. Restart the lake tiering job.

ISR updates and lake snapshot commits resumed. No TabletServer restart was needed. Increasing the buffer limit restored service but did not resolve the metadata accumulation.

Related documentation issues:

  • #4336
  • #4338
Are you willing to submit a PR?
  • I'm willing to submit a PR!
Lenguaje dominante
Java
Estrellas
2.2k
Forks
656
Merge medio
1 d 21 h
PR fusionados (30 d)
127

Preparar el entorno

  • Sin Dockerfile ni archivo de Docker Compose
  • Tiene una plantilla de pull request
  • Sin guía de contribución

Primeros pasos

  1. Lee el issue completo y luego la guía de contribución del proyecto.
  2. Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
  3. Haz un fork del repositorio y trabaja en una rama.
  4. Abre un pull request que haga referencia al número del issue.

Más de apache/fluss

Todos los issues de apache/fluss

Issues similares

Más issues de Java

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.