Add option to change the asterisk prefix to a dash
Nobody has claimed this yet.
Assessment
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Newbie friendliness
- 35/100
Research direction
The issue names no files, tests, or entry points. Start by locating the command's option parsing and TOC list-generation entry points, then verify that a new option changes the generated list marker from * to - without altering other output.
Written by the indexing model from the issue text.
Description
Hi, love this tool.
Is it possible to add an option to generate a list of items starting with a dash rather than an asterisk?
- Dominant language
- Shell
- Stars
- 3.3k
- Forks
- 2.7k
- Avg merge
- 20m
- Merged PRs (30d)
- 7
Getting set up
- Ships a Dockerfile or Docker Compose file
- No pull request template
- No contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from ekalinin/github-markdown-toc
-
Difficulty 1/5 1-3 hours Newbie friendliness 78/100
ekalinin/github-markdown-toc#176 ·
-
documentation
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
ekalinin/github-markdown-toc#165 ·
-
[Feature] `--no-code-tag-removal` flag allowing to make removal of backticks in TOC entries optionalOpenenhancement
Difficulty 3/5 1-2 days Newbie friendliness 58/100
ekalinin/github-markdown-toc#153 ·
-
Difficulty 3/5 1-2 days Newbie friendliness 35/100
ekalinin/github-markdown-toc#152 · 1 reaction ·
-
bug
Difficulty 3/5 1-2 days Newbie friendliness 35/100
ekalinin/github-markdown-toc#141 ·
All issues in ekalinin/github-markdown-toc
Similar issues
-
documentation
Difficulty 2/5 1-3 hours Newbie friendliness 84/100
githubnext/gh-aw-workshop#3969 ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 85/100
getumbrel/umbrel-apps#6137 ·
Maintainers usually reply within 2 days
-
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
-
backlog bug
Difficulty 2/5 1-3 hours Newbie friendliness 86/100
WLAN-Pi/wlanpi-profiler#306 ·
Maintainers usually reply within 1 day
-
area: backend good first issue priority: P3 - low size: S type: bug
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Mizithra/ActiveTerrain#31 ·