Website LogBack Configuration
Nobody has claimed this yet.
Assessment
- Difficulty
- 1/5
- Estimated time
- Under an hour
- Newbie friendliness
- 45/100
- Issue type
- Documentation
- Clarity
- Clearly specified
- Activity status
- Stale
- Tech stack
- html
- Domain
- documentation
Research direction
Open the linked First entry documentation page and inspect its Logback configuration, then compare it with the working minimal example at the linked logback-test.xml. Done means the website configuration is valid and produces useful logs like the example.
Written by the indexing model from the issue text.
Description
The Logback configuration found under First entry, is in error, as it is not wrapped in a root element (ie. <configuration>). Even so, this does not result in any useful logs.
The Logback configuration given in minimal example does work as expected.
I realize that keeping documentation and code in sync is a tedious task, but given that the website is a 24x7 "sales rep" for Ebean, it should be important to do so. Case in point, I directly one of my clients to Ebean, who became disenchanted while running into errors when following Getting Started.
- Dominant language
- HTML
- Stars
- 11
- Forks
- 30
- PR merge metrics
- No merged PRs in 30d
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from ebean-orm/website-source
-
Difficulty 3/5 1-2 days Newbie friendliness 45/100
ebean-orm/website-source#62 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 35/100
ebean-orm/website-source#39 · 1 comment ·
-
Difficulty 4/5 3-5 days Newbie friendliness 25/100
ebean-orm/website-source#37 · 5 comments ·
All issues in ebean-orm/website-source
Similar issues
-
sync-en
Difficulty 1/5 1-3 hours Newbie friendliness 88/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
agilepathway/label-checker#640 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 75/100
BasedHardware/omi#15662 · 1 comment ·
-
documentation help wanted
Difficulty 2/5 1-3 hours Newbie friendliness 90/100
-
Difficulty 1/5 1-3 hours Newbie friendliness 88/100